2.3.2.3 Clamp Mounting on Long & Short Sides
Figure 7: Installation of clamps on long
& short side of frame
Note:
The installation method of clamps on short sides is based on the internal results in Jinko, not
evaluated by UL.
The installation method of clamps on long and short sides is based on the internal results in
Jinko, not evaluated by UL.
3. Wiring and Connection
a) Before this procedure, please read the operation instructions of the PV system carefully.
Connect the PV module connections in series or parallel, which is determined by the user‟s
configuration requirement for system power, current and voltage.
b) PV modules connected in series should have similar current, and modules must not be
connected together to create a voltage higher than the permitted system voltage. The
maximum number of modules in series depends on system design, the type of inverter and
environmental conditions.
Max. Test Pressure: 2400Pa (positive) &
Module
type
A*B
Group 1
1650*992 & 1665*1002
Group 3
Group 7
1650*992 &1665*1002
Group 9
Group 4
1956*992 & 1979*1002
Group 6
Group 10
1956*992 & 1979*1002
Group 12
Group 2
1665*992 & 1684*1002
Group 5
1665*992 & 1684*1002
1987*992 & 2000*992
Group 8
& 2008*1002
1987*992 & 2000*992
Group 11
& 2008*1002
Group13
2031*1008
Group 15
Group14
1704*1008
Group 16
Table 6: Mechanical dimensions of modules installed
with clamps on long & short side of frame
- 12 -
Dimension (mm)
2400Pa (negative)
mechanical load
J
K
M
50
240
400
50
240
400
50
240
400
50
240
400
50
240
400
50
240
400
50
240
400
50
240
400
50
240
400
50
240
400
N
420
420
480
480
420
420
480
480
480
480

Advertisement

Table of Contents
loading

This manual is also suitable for:

Jkm p-60b seriesJkm p-60-j4 seriesJkm p-60b-j4 seriesJkm pp-60 seriesJkm pp-60b seriesJkm pp-60 plus series ... Show all

Table of Contents