Table 3. Planning tasks (continued)
Task
For third-party rack support, see the detailed physical
requirements in
Third Party Racking Option for PowerMax 2000
page 50 and
Third Party Racking Option for PowerMax 8000
page 55.
10
Before You Begin
Comments and/or Provide
flying leads are used an electrician must connect the power. The
connector type must be verified as part of the installation plan.
Best Practices for AC Power Connections
details.
The field representative working the order must:
on
•
Review the requisite information regarding the third party
on
racking option.
•
In Sizer, select the configuration. In the Hardware Options
screen, under Rack Type, select Third Party.
on page 62 provides