Installing the ODU
Installation Procedure
b
Installing the ODU on a Dual-Polarized Antenna
 Do not install the ODU under harsh weather conditions, such as windy, rainy, or stormy weather.
 After the ODU is unpacked or powered off, it must be powered on within 24 hours to avoid moisture
accumulation in it.
 Do not damage the coating when you install or replace an ODU.
 In case of operating in the sea or around the coast area (within 3.7 km from coastline) or 3 km away
from inland pollution sources (including coal mines, metallurgic plant, thermal power plant , and chemical
plant), measure must be taken for the ODU against salt damage. Please contact HUAWEI for the
countermeasure.
Direct Mounting Mode
Start
Install the antenna
Referring to the instructions for
Install the OMT
P29
P18
Install the ODU on the OMT
P31
Install the ODU cables
P32~P42
End
13
13
13
the antenna