Download Print this page
Hide thumbs Also See for Oas Indo OS8732 Ei2:

Advertisement

Quick Links

Oas Indo Manual
PRE-I NSTAL LATI ON

Advertisement

loading

Summary of Contents for Orbital Systems Oas Indo OS8732 Ei2

  • Page 1 Oas Indo Manual PRE-I NSTAL LATI ON...
  • Page 2: Eu Declaration Of Conformity

    (34) not throw this manual away, keep it handy for future reference. KIWA TG 1503 KIWA K100686/01 IAPMO E10059 IAPMO C-11154 IAPMO W-11301 Signed for and on behalf of Orbital Systems AB Place Date Name Position Malmö 2019-08-28 Mehrdad Mahdjoubi This system is certified by IAPMO...
  • Page 3 • Defects caused by faulty maintenance, incorrect installation or a faulty repair. Repairs should be carried out only by Orbital Systems, one of our (34) certified service partners or the customer only when certified.
  • Page 4 S E R V I C E TA B L E O F C O N T E N T S Orbital Systems and our team of expert staff including our certified Installation Overview Service Partners are available to assist you should you require product...
  • Page 5 I N S TA L L AT I O N O V E R V I E W (34)
  • Page 6 P R O D U C T M E A S U R E M E N T S 575 mm (147) (34) 1266 mm 440 mm Ø 75 mm 812 mm 145 mm 122 mm 184 mm...
  • Page 7 P R E R E Q U I S I T E S F O R I N S TA L L AT I O N Electrical supply EU-one phase: AC 220-240 V / 50 Hz / 16 A Residual circuit breaker: One per shower required.
  • Page 8 I N S TA L L AT I O N O V E R V I E W Cold and hot water supply Recommended Min: 9 litres/minute 575 mm Recommended Min: 3 bar, maximum 10 bar Electrical supply, power: 230 V/16 A (34) Core Wall Enclosure: HxWxD: 932 x 538 x 145 mm...
  • Page 9 R E C YC L I N G O P T I M I S AT I O N S I T E S U G G E S T I O N S Based on 8 minutes shower (7 minutes recycling) in shower space with underfloor heating.
  • Page 10 P R E - I N S TA L L AT I O N (34) watch video: https://bit.ly/2TOBJNA...
  • Page 11 C O M P O N E N T O V E R V I E W Wall box UNI Push + Pan head screw, x4 Core Wall Enclosure + Pan head stainless steel screw, x8 Connection Pipe (34) Frame Drain Unit + Countersunk stainless steel screw, x5 Outlet Unit (OS provides requested alternative) PEX hose with corrugated sleeve...
  • Page 12 K I T M E A S U R E M E N T S 538 mm 440 mm 145 mm 452 mm (34) 114 mm 150 mm Ø40 mm 812 mm 184 mm 690 mm 122 mm Ø75 mm 440 mm 650 mm...
  • Page 13 C R U C I A L K I T I N S TA L L AT I O N M E A S U R E M E N T S (34) Finished floor height where it is level.
  • Page 14 CAUTION. Crucial that all nogging pieces are in level and 145 mm set according to recommended measurements to avoid misalignment in the shower installation. 442 mm Mark the finished floor height, ≥45 mm where it is level (>145 mm). 85 mm Inclination will be accounted for at a later stage.
  • Page 15 CAUTION. Plumbing and electrical installation should be performed according to local regulations by a licensed professional. Apply wall covering according to local regulations. Countersunk stainless steel screw (34) Ø50 mm Mirror slot in stud and wall covering depending on hand shower placement.
  • Page 16 (34) Finished floor height where it is level. Connect Drain Unit to the sewerage system as defined by local regulations. Drain unit is centred in the shower space.
  • Page 17 Apply lubricant Countersunk stainless steel screw (34) 1000mm Anchors provided by customer Anchor the Drain Piping according to local regulations. Finished floor height, where it is level.
  • Page 18 (34) Secure pipe in slot in stud and anchor with pipe clamp. Apply wall covering according to local regulations.
  • Page 19 (34)
  • Page 20 600 mm Secure the pipe and anchor with pipe clamp. (34) Pan head stainless steel screw CAUTION. Check the water tightness to eliminate leakage.
  • Page 21 Pan head stainless steel screw (34) Follow instruction provided in installation box for the Wall box UNI Push. Should be performed according to local regulations by a licensed professional. Measure and mark placement of Wall box UNI Push.
  • Page 22 Ø 32 mm Ø 25 mm Ø 16-20 mm Ø 12 mm Cut the cone depending on the diameter of the hose. PEX hose with PEX hose with (34) corrugated sleeve corrugated sleeve Provided by customer Provided by customer CAUTION. The Core shall be connected to the top inlet.
  • Page 23 Cut the pipes. 100 mm Cut the corrugated sleeves. (34) Anchors provided by customer CAUTION. Cut the Corrugated sleeve as close as possible to the water tight seal. Length might be adjusted depending on the chosen connector applied later.
  • Page 24 (34) WARNING. Electrical installation should be performed according to local regulations by a licensed electrician. Raise the floor according to local regulations to the same level as the bottom of the bent edge of the Drain Unit flange.
  • Page 25 Make sure the surface adjacent to the Drain Unit is flush with the flange. (34) Min. 2% Apply wall covering according to local regulations. Form a steep inclination according to local regulations (min. 2% inclination) towards the Drain Unit.
  • Page 26 ≤X mm (34) X mm X mm Install waterproof membrane according to local regulations. Make sure they cover the metal flanges of the Drain Unit and the Core Wall Enclosure according to membrane supplier recommendation. Clean the metal flanges of the Drain Unit and the Core Wall Enclosure.
  • Page 27 Adjust M3 (5.5mm driver) (34) Secure Level and adjust Panel Template angle by adjusting the screws in the hinges. Ensure centerelation to the Core Wall Enclosure.
  • Page 28 (34)
  • Page 29 (34) Apply mortar up to the sides of the Frame. Apply tiles up against all sides of the Panel Template.
  • Page 30 Make sure the tiles do not overlap the Grating, allowing it to be removed. CAUTION. Do not cut the PEX hoses. They need to stick out for coming installation steps. Ø 30 mm (34) Ø 30 mm Min 8 mm, Floor tiles must be level with, or higher Max 16 mm than the Frame.
  • Page 31 (34) 2 mm 2 mm...
  • Page 32 (34) Apply sealant according to local regulations. Pre-installation completed.
  • Page 33 C E R T I F I E D S P A C E T E C H N O L O G Y...