Site Planning Guide
Sun Microsystems, Inc.
www.sun.com
Part No. 819-5648-15
February 2008 Rev A
Submit comments about this document at: http://www.sun.com/hwdocs/feedback

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Blade 8000 Series and is the answer not in the manual?

Questions and answers

Summary of Contents for Sun Microsystems Blade 8000 Series

  • Page 1 Sun Blade 8000 Series ™ Site Planning Guide Sun Microsystems, Inc. www.sun.com Part No. 819-5648-15 February 2008 Rev A Submit comments about this document at: http://www.sun.com/hwdocs/feedback...
  • Page 2 États-Unis et dans d’autres pays, licenciée exclusivement par X/Open Company, Ltd. Sun, Sun Microsystems, le logo Sun, Sun Blade, et Solaris sont des marques de fabrique ou des marques déposées de Sun Microsystems, Inc. aux États-Unis et dans d’autres pays.
  • Page 3: Table Of Contents

    Sun Blade 8000 Series Product Web Sites v Related Documentation vi Documentation, Support, and Training vii Sun Welcomes Your Comments vii Site Planning for the Sun Blade 8000 Series Systems 1 Customer Obligations 1 System Configuration 2 Preparing the Site Before the System Arrives 2...
  • Page 4 Chassis and Components Dimensions and Weights 12 Environmental Specifications 13 AC Power Requirements 14 Thermal Design Specifications 14 Airflow Requirements 15 Acoustic Noise Emissions 15 Regulatory Compliance 16 Site Planning Checklist 18 Sun Blade 8000 Series Site Planning Guide • February 2008...
  • Page 5: Preface

    Preface The Sun Blade 8000 Series Site Planning Guide provides the data center site requirements for the installation of the Sun Blade 8000 Modular System and the Sun Blade 8000 P Modular System. This document provides detailed physical, electrical, power, and cooling specifications, as well as recommendations for compatible cabinets.
  • Page 6: Related Documentation

    Related Documentation You can locate the Sun Blade 8000 Series documents by searching for Sun Blade 8000 at the following Sun documentation web site: http://docs.sun.com You can go directly to the Sun Blade 8000 Series documentation pages at the following web sites: For the Sun Blade 8000 Modular System ■...
  • Page 7: Documentation, Support, And Training

    Sun is interested in improving its documentation and welcomes your comments and suggestions. You can submit your comments by going to: http://www.sun.com/hwdocs/feedback Please include the title and part number of your document with your feedback: Sun Blade 8000 Series Site Planning Guide, part number 819-5648-15 Preface...
  • Page 8 Sun Blade 8000 Series Site Planning Guide • February 2008...
  • Page 9: Site Planning For The Sun Blade 8000 Series Systems

    8000 Modular System or Sun Blade 8000 P Modular System in your data center. For safety and compliance information, refer to the Sun Blade 8000 Series Safety and Compliance Manual (819-5652) and the Important Safety Information for Sun Hardware Systems (816-7190).
  • Page 10: System Configuration

    Preparing the Site Before the System Arrives Install the Sun Blade 8000 Series systems in accordance with the local safety codes and regulations at the facility site. You must be familiar with and adhere to the safety precautions in the Sun Blade 8000 Series Safety and Compliance Manual (819-5652).
  • Page 11: Load-Bearing And Handling Precautions

    8000 P Chassis uses four power supply modules. In both chassis, the modules provide 48V at 3000W per supply for a total of 9000W per chassis. The AC power requirements for the Sun Blade 8000 Series systems are as follows: Voltage - 200 to 240 VAC ■...
  • Page 12: Power Cord Requirements

    N+1 power supply redundancy. Power Cord Requirements The connection to the Sun Blade 8000 Series chassis AC inlets requires the following types of power cords, which are dependent on site location. Each AC inlet requires a separate power cord; therefore, six power cords are required for the Sun Blade 8000 Chassis and four power cords are required for the Sun Blade 8000 P Chassis.
  • Page 13: Power Calculations

    Power Calculations You can use the Sun Blade 8000 Series Power Calculators to help you determine the power requirements of either the Sun Blade 8000 or Sun Blade 8000 P Modular System. The intent of the Power Calculator is to provide guidance for estimating the electrical and heat loads per populated chassis for racking and facilities planning purposes.
  • Page 14: Cooling Requirements

    The amount of heat output per Sun Blade 8000 Series system varies, depending on the system configuration. The systems are equipped with fans that route cool air throughout the chassis from front to rear.
  • Page 15: Airflow Requirements

    Airflow Requirements The Sun Blade 8000 Series systems use forced air to draw in ambient air for cooling from the front of the chassis, while heated air exits the rear of the chassis. The design of the systems provides two primary regions of airflow: The lower airstream cools the Server Modules, and the upper airstream cools the power supplies, Chassis Monitoring Modules, and Network Express Modules.
  • Page 16: Compatible Cabinets

    Compatible Cabinets Note – The Sun Blade 8000 Series Chassis is designed for 4-post rackmounting only. Two-post rackmounting is not supported. The Sun Blade 8000 Series Chassis are designed for rackmounting. The chassis can be mounted into 35.4 to 39.4 inches (900 to 1000 mm) deep, 19-inch EIA-310D cabinets.
  • Page 17: Route To The Data Center

    Site Planning for the Sun Blade 8000 Series Systems...
  • Page 18: Placement Of A Sun Product

    Placement of a Sun Product Do not block or cover the openings of the Sun Blade 8000 Series system. Never place a Sun product near a radiator or heat register. Failure to follow these guidelines can cause overheating and affect the reliability of your Sun product. Air cools the Sun Blade 8000 Series system from front to back.
  • Page 19: System Specifications

    1 power interface module ■ 9 Server Module filler panels, 1 CMM filler panel, and 2 Network Express Module ■ filler panels Also shipped with the Sun Blade 8000 Series systems are: Rackmount rail kit ■ Rackmount tray ■ Rack Alignment Template ■...
  • Page 20: Shipping Crate Physical Specifications

    • Front fan module: 3 lb (1.36 kg) • Rear fan module: 3 lb (1.36 kg) • Network Express Module: 7 lb (3.18 kg) • PCI Express ExpressModule: 2 lb (0.91 kg) Sun Blade 8000 Series Site Planning Guide • February 2008...
  • Page 21: Environmental Specifications

    Sine Vibration Z (vertical)-axis: 0.15G Z (vertical)-axis: 0.50G X/Y axis: 0.10G X/Y axis: 0.25G 5 to 500 Hz sine 5 to 500 Hz sine Shock 3Gs, 11 msec, half sine (rackmounted enclosure) Site Planning for the Sun Blade 8000 Series Systems...
  • Page 22: Ac Power Requirements

    Total heat dissipation/HVAC load 30,735 BTU/hr (9000W N+N configuration for Sun Blade 8000 Modular System or 9000W N+1 configuration for Sun Blade 8000 P Modular System) Average temperature rise through C (59 chassis Sun Blade 8000 Series Site Planning Guide • February 2008...
  • Page 23: Airflow Requirements

    Acoustic Noise Specifications (Sun Blade 8000 and 8000 P Systems) TABLE 11 Function Specification Operating acoustic noise 90 dBA from fron (maximum fan speed) 95 dBA from rear Declared noise emissions are in accordance with ISO 9295/9296 standards. Site Planning for the Sun Blade 8000 Series Systems...
  • Page 24: Regulatory Compliance

    Regulatory Compliance The Sun Blade 8000 Series systems comply with the following Sun Microsystems and regulatory agency standards. Regulatory Compliance TABLE 12 Category Standard Product safety • UL approved to UL 60950 and C22.2 No. 60950 • TUV approval to EN60950-1 and CB Report IEC 950 3rd Edition;...
  • Page 25 • IEC 61000-4-11 Voltage dips, short interruptions, and voltage variations immunity tests Line distortion • EN 61000-3-2 per EMC Directive 89/336/EEC Voltage fluctuations • EN 61000-3-3 per EMC Directive 89/336/EEC and flicker Site Planning for the Sun Blade 8000 Series Systems...
  • Page 26: Site Planning Checklist

    Are pallet jacks or carts available to move the systems and racks from the loading dock to the computer room? Yes__ No__ Will the equipment fit through the access route and into the computer room? Sun Blade 8000 Series Site Planning Guide • February 2008...
  • Page 27 Yes__ No__ Have you acquired all the hardware needed to set up the systems and racks? Yes__ No__ Do you have the documents required to install the systems into the racks? Site Planning for the Sun Blade 8000 Series Systems...
  • Page 28 Sun Blade 8000 Series Site Planning Guide • February 2008...