Download Print this page
Bunn JDF S Series Preventive Maintenance

Bunn JDF S Series Preventive Maintenance

Advertisement

Quick Links

JDF S Preventive Maintenance
In order to maintain proper operation and long service life BUNN recommends performing the preventive mainte-
nance every 6 months. Individual customers will vary with some customers choosing not to receive preventive main-
tenance. Some of the PM items may require more frequent maintenance depending on the site conditions.
Tools Required:
Flat blade screwdriver
8 inch crescent wrench (2)
Needle Nose Pliers
Velcro Tape
Graduated measuring cup
Refractometer
Thermometer
Flashlight
5 gal. bucket
Tube PM Kit BUNN PN: 39690.0000 (1 per dispense station)
Kay-5 Sanitizer (50 Count BUNN P/N: 24634.0001) (200 Count BUNN P/N: 24634.0000)
BUNN refillable container (BUNN P/N: 39302.0000)
Condenser Cleaner
Rubber gloves
Safety goggles or face shield
Fin Comb
Mild non abrasive detergent and cloth
Vacuum with soft brush attachment
Prior to servicing the brewer:
Sanitize the dispenser before you begin the preventive maintenance process.
Disconnect the water and electrical supply.
Assess placement of dispenser to perform PM process.
Check and make sure you have the necessary safety equipment of cleaning the condenser.
Remove the lower splash panel.
Remove the right side panel.
PM Steps
Step1: Remove inlet valve connector fitting and clean inlet valve strainer.
Using your hand and unscrew the valve adapter fitting and set aside.
Using the needle nose pliers gently grab the strainer tab and pull the strainer out of the valve.
Clean and rinse strainer of any sediment or mineral build-up.
Re-installation is the opposite of removal.
Step 2: Replacement of lamp in lighted door assembly.
Using a flat blade screwdriver, remove the five screws securing the outer door cover to the inner door.
Disconnect the door switch connector or connectors from the auxiliary switch CBA and set door cover aside.
Gently grab the failed lamp and rotate half turn until lamp connection studs are aligned up with lamp socket
opening and remove lamp.
Re-installation of new lamp is the opposite of removal.
Step 3: Remove and clean the mesh air filter.
Using your hand, grab the mesh filter triangle handle and pull the air filter from the dispenser.
Wash the air filter in warm soapy water and dry.
Using a flashlight, shine the light through the condenser to check for dirt between the fins. Inspect condenser fins
for straightness. Go to the next step of Cleaning the Condenser.
Inspect Velcro straps for adhesion to air filter and dispenser and be ready to replace after cleaning of the
condenser.
Rev. 05/19/09

Advertisement

loading

Summary of Contents for Bunn JDF S Series

  • Page 1 JDF S Preventive Maintenance In order to maintain proper operation and long service life BUNN recommends performing the preventive mainte- nance every 6 months. Individual customers will vary with some customers choosing not to receive preventive main- tenance. Some of the PM items may require more frequent maintenance depending on the site conditions.
  • Page 2 Step 4: Cleaning the condenser. □ Using a soft cleaning brush attachment, gently vacuum the condenser coil fins. □ Using a flashlight, shine the light through the condenser fins to re-check for cleanliness or dirt between the fins. □ Heavy build-up of grease in the condenser may require the use of a commercial condenser cleaner. □ Follow the manufacture warning and safety instructions along with how to instructions supplied with the cleaner. Step 5: Replacing the peristaltic pump tubing.
  • Page 3 Step 6: Stir the contents of the cup, and use the refractometer (according to the manufacturer’s instructions) to check the brix %. Step 7: Adjust the pump speed (down to decrease the brix %; up to increase the brix %) to achieve the correct brix % as described in Pump Speed Adjustment. Step 11: If customer has a BUNN water filtration system installed before the dispenser, replace the filter or filter car- tridge. Rev. 05/19/09...