Model HE-BLE 8’ Wide ASSEMBLY INSTRUCTIONS ISSUE:...
Page 2
Dear Customer, Thank you for ordering your new greenhouse from us. We hope you find these in- structions along with each member of 'The Greenhouse People' team helpful and in- formative. Please read all information before you begin and take care to read all instructions it will save you a lot of time and frustration later on.
BASE PREPARATION You have quite a choice in terms of the style of base that you can prepare. The most important objective is that it is level. The different styles of bases that we recommend are as follows: Note: Your greenhouse size is only nominal, for example a 6 X 8 greenhouse is not exactly 6’...
Page 9
BASE PREPARATION BRICK BASE The following table gives the external dimensions for a brick base. Look for your building size in the left hand column and read across for the width and length. The dimensions allow the lips of the cills to overhang. This helps prevent water running back into the greenhouse.
Page 10
BASE PREPARATION A quick guide to laying down slabs suitable for any garden structure. Please read ALL before you begin. We recommend that you lay paving slabs onto a dry mixture of sharp sand and cement. A ratio of 6:1 would be ideal. We recommend using a 2”...
SAFETY Toughened Glass VERY IMPORTANT INFORMATION Please take extra CARE handling toughened glass. It is extremely vulnerable to BREAKAGE at the edges and in particular, the CORNERS. When you are MOVING it, please take care not to brush the EDGES of the glass against concrete etc..
GENERAL ADVICE Preparation and things to consider: Bear in mind that constructing your greenhouse can take some time, you may need to leave it and come back to it. The more space available in which to work the better, a large clean, clear garage floor is ideal or a flat lawn area.
SIDE ASSEMBLY Part Length Part Name 8 X 6 8 X 8 8 X 10 8 X 12 Base bracket Bracing, diagonal - 6' & 8' W 1,742 Cill, side 6' L 1,888 Cill, side 8' L 2,508 Cill, side 10' L 3,128 Cill, side 12' L 3,748...
Page 14
SIDE ASSEMBLY 6’ LONG 6’ LONG EXAMPLE 8’ LONG 10’ LONG 12’ LONG...
REAR ASSEMBLY Part Name Part Length Required Base bracket Bracing, flat 1,779 Bracing, rear purling - 8' W 2,496 Cill, front & rear 8' W 2,508 Glazing bar, corner, roof left - 8' W* 1,501 Glazing bar, corner, roof right - 8' W* 1,501 Glazing bar, corner, side 1,670...
FRONT ASSEMBLY Part Length Part Name Required Base bracket Bracing, front purling - 8' W Bracing, flat 1,779 Cill, front & rear 8' W 2,508 Door runner - 2508mm 2,508 Door stop Door track - 2508mm 2,508 Door track support bracket Door track, main support - 1232mm 1,232 Glazing bar, corner, roof left - 8' W...
DOOR ASSEMBLY Part Length Part Name Required Door middle - 618mm Door stile - female, with lock 1,880 Door stile - female, without lock 1,880 Door stile - male 1,880 Door handle Edging Strip - 870mm Draught Excluder Fur 3,800 Screws, self tapping - 19mm M3.5 Bolt, square head - 10mm M6 Bolt, hexagon head - 25mm M4...
Page 23
DOOR ASSEMBLY 563 X 880 563 X 880 563 X 880 563 X 880...
ROOF VENT ASSEMBLY Part Name Part Length Qty Required \ vent Casement stay* Vent - bottom Vent - side Vent - slam bar Vent - top Bolt, square head - 10mm M6 Nut - M4* Nut - M6 Nut caps Screws, self tapping - 19mm M3.5 Silicone, gun Silicone, tube...
Page 25
ROOF VENT ASSEMBLY This is a view of the underside of the vent This is a view of the underside of the vent bottom meeting the vent side 610 X 610 Looking at the vent top from the outside Looking at the vent bottom from the outside This is a view of the underside of the vent top Looking down onto the vent bottom from outside meeting the vent side...
MAIN BUILDING ASSEMBLY Part Length Part Name 8 X 6 8 X 8 8 X 10 8 X 12 Rear End Front End Side Glazing bar, roof - 8' W 1,500 Ridge - 6' L 1,888 Ridge - 8' L 2,508 Ridge - 10' L 3,128...
Page 27
MAIN BUILDING ASSEMBLY Very Important: Bolts will need to be slid into each roof bar for the ridge cantilever, two more bolts to attach the hanging basket rail, one more bolt is needed to attach the eave cantilever bracing between the roof and the side. Please note: At this stage you will need to insert an extra bolt into each bar either side of a vent opening.
Page 29
MAIN BUILDING ASSEMBLY FITTING OPTIONAL CRESTING AND FINIALS When fitting the finials and cresting you need a hacksaw, silicone gun and tube. Before you get into position you need to take a hacksaw and trim off the male end of one of the cresting sections.
LOUVRE ASSEMBLY Part Name Part Length Required Top/Bottom cill Side bar Side bar - with handle Screws, self tapping - 10mm M4 Crop head bolts - 10mm M6 Nuts - M6 Toughened glass (L) 573 X 100 1. Trim rubber to side lengths and place top and bottom cill into position on side bars. Secure with self tapping screws.
Page 31
LOUVRE ASSEMBLY Self tapping screws - 10mm M4 Side bar Top cill Use this slot to attach the louvre to the greenhouse frame 573 X 100 Bottom cill Self tapping screws - 10mm M4 Side bar Top cill Top cill Side bar Pinch before inserting glass...
GLAZING You are about to begin glazing your greenhouse. It is vital that you take as many safety precautions as possible, especially when handling glass. When glazing the roof we recommend that one individual stands on some ladders inside the greenhouse (It is important that this person is not directly underneath the glass, it is best to stand to one side and help guide the glass in with one hand), while someone else passes the panes up from the outside.
FINAL FIXING VENT INSTALLATION MM¹ 610 X 610 610 X 545 610 X 545 Vent hinge If you are using a casement stay attach the vent pegs to the slam bar using M4 countersunk screws and M4 nuts (you may find it easier to use needle nose pliers to hold the nut as you tighten the bolt).
Page 35
FINAL FIXING DOOR INSTALLATION Take one of the doors and locate the first set of door wheels on the rails in the door track (Diagram OO). When doing this you also need to locate the door guide on the bottom of the door in the door runner (Diagram PP). When both of these are located slide the door further along the track until you can locate the second set of door wheels.
Page 37
FINAL FIXING HANGING BASKET BAR The hanging basket bars are fixed below the vents on the undersides of the roof. Use the two remaining bolts in the bolt channels of the roof bars to attach the hanging basket bar. Start at one end loosely attaching nuts and work along to the other end. (If you are using an autovent you may need to adjust the position of the bars to allow the autovent to work freely).
Page 38
FINAL FIXING DOWNPIPE INSTALLATION Part Name Part Length Required Screws, self tapping - 19mm M3.5 Gutter outlet Gutter stop end Downpipe 1500 45 degree double collar Downpipe bracket Firstly you need to decide whether you want the water in your gutters to drain to the front or the rear of the greenhouse.
Page 39
FINAL FIXING ANCHORING BUILDING TO SLAB / CONCRETE BASE For this final stage you will need eight No.10 X 2” screws, eight brown wall plugs, a 7mm masonry drill bit and a hammer drill. Fixing the greenhouse to the ground is very simple to do. When you built the front, rear and side assemblies you will have attached base brackets (Part number: 300) in specific places around the building.
Page 40