Greenhouse People HE-BLE Assembly Instructions Manual

Greenhouse People HE-BLE Assembly Instructions Manual

8’ wide

Advertisement

Quick Links

Model
HE-BLE
8' Wide
ASSEMBLY INSTRUCTIONS
ISSUE:
4

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the HE-BLE and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Greenhouse People HE-BLE

  • Page 1 Model HE-BLE 8’ Wide ASSEMBLY INSTRUCTIONS ISSUE:...
  • Page 2 Dear Customer, Thank you for ordering your new greenhouse from us. We hope you find these in- structions along with each member of 'The Greenhouse People' team helpful and in- formative. Please read all information before you begin and take care to read all instructions it will save you a lot of time and frustration later on.
  • Page 3: Table Of Contents

    CONTENTS Page 4 - 6 COMPONENTS AND FITTINGS INCH — MM CONVERSION CHART 8 -10 BASE PREPARATION SAFETY GENERAL ADVICE 13 - 15 SIDE ASSEMBLY 16 - 17 REAR ASSEMBLY 18 - 21 FRONT ASSEMBLY 22 - 23 DOOR ASSEMBLY 24 - 29 ROOF VENT ASSEMBLY 26 - 29...
  • Page 4 COMPONENTS & FITTINGS Base Bracket - 300 Bracing, Diagonal - 303 Bracing, Bracing, Flat - 315 Purlins - 308 & 314 Cill, Front & Rear - 333 Cill, Side - Door Middle - 373 Door Runner - 375 350,351,352,353 & 354 Door Stiles (female) - Door Stile (male) - 381 Door Stop - 400...
  • Page 5 COMPONENTS & FITTINGS Glazing Bar, Side Glazing Bar, Front & Glazing Bar, Roof & Gutter - 461, 462, 463 & Corner - 430 Rear - 438, 449 Side - 444 & 447 Ridge - 481, 482, 483 & Ridge Plate - 500 Door Track Threshold - 526 Vertical Support - 508...
  • Page 6 COMPONENTS & FITTINGS USE MEASUREMENTS TO HELP YOU IDENTIFY PARTS Door Stop Bung - 560 Glazing Rubber - 570 Bolt, Hex Head, M4 Bolt, Square Head, M6 [Rubber] 25mm - 575 10mm - 576 Bolt, Square Head, M6 Nut, M4 - 578 Nut Cap, M6 - 580 Screw, Self Tapping, 15mm - 588...
  • Page 7: Inch - Mm Conversion Chart

    INCH — MM CONVERSION CHART...
  • Page 8: Base Preparation

    BASE PREPARATION You have quite a choice in terms of the style of base that you can prepare. The most important objective is that it is level. The different styles of bases that we recommend are as follows: Note: Your greenhouse size is only nominal, for example a 6 X 8 greenhouse is not exactly 6’...
  • Page 9 BASE PREPARATION BRICK BASE The following table gives the external dimensions for a brick base. Look for your building size in the left hand column and read across for the width and length. The dimensions allow the lips of the cills to overhang. This helps prevent water running back into the greenhouse.
  • Page 10 BASE PREPARATION A quick guide to laying down slabs suitable for any garden structure. Please read ALL before you begin. We recommend that you lay paving slabs onto a dry mixture of sharp sand and cement. A ratio of 6:1 would be ideal. We recommend using a 2”...
  • Page 11: Safety

    SAFETY Toughened Glass VERY IMPORTANT INFORMATION Please take extra CARE handling toughened glass. It is extremely vulnerable to BREAKAGE at the edges and in particular, the CORNERS. When you are MOVING it, please take care not to brush the EDGES of the glass against concrete etc..
  • Page 12: General Advice

    GENERAL ADVICE Preparation and things to consider: Bear in mind that constructing your greenhouse can take some time, you may need to leave it and come back to it. The more space available in which to work the better, a large clean, clear garage floor is ideal or a flat lawn area.
  • Page 13: Side Assembly

    SIDE ASSEMBLY Part Length Part Name 8 X 6 8 X 8 8 X 10 8 X 12 Base bracket Bracing, diagonal - 6' & 8' W 1,742 Cill, side 6' L 1,888 Cill, side 8' L 2,508 Cill, side 10' L 3,128 Cill, side 12' L 3,748...
  • Page 14 SIDE ASSEMBLY 6’ LONG 6’ LONG EXAMPLE 8’ LONG 10’ LONG 12’ LONG...
  • Page 15 SIDE ASSEMBLY...
  • Page 16: Rear Assembly

    REAR ASSEMBLY Part Name Part Length Required Base bracket Bracing, flat 1,779 Bracing, rear purling - 8' W 2,496 Cill, front & rear 8' W 2,508 Glazing bar, corner, roof left - 8' W* 1,501 Glazing bar, corner, roof right - 8' W* 1,501 Glazing bar, corner, side 1,670...
  • Page 17 REAR ASSEMBLY...
  • Page 18: Front Assembly

    FRONT ASSEMBLY Part Length Part Name Required Base bracket Bracing, front purling - 8' W Bracing, flat 1,779 Cill, front & rear 8' W 2,508 Door runner - 2508mm 2,508 Door stop Door track - 2508mm 2,508 Door track support bracket Door track, main support - 1232mm 1,232 Glazing bar, corner, roof left - 8' W...
  • Page 19 FRONT ASSEMBLY @¹...
  • Page 20 FRONT ASSEMBLY...
  • Page 21 FRONT ASSEMBLY...
  • Page 22: Door Assembly

    DOOR ASSEMBLY Part Length Part Name Required Door middle - 618mm Door stile - female, with lock 1,880 Door stile - female, without lock 1,880 Door stile - male 1,880 Door handle Edging Strip - 870mm Draught Excluder Fur 3,800 Screws, self tapping - 19mm M3.5 Bolt, square head - 10mm M6 Bolt, hexagon head - 25mm M4...
  • Page 23 DOOR ASSEMBLY 563 X 880 563 X 880 563 X 880 563 X 880...
  • Page 24: Roof Vent Assembly

    ROOF VENT ASSEMBLY Part Name Part Length Qty Required \ vent Casement stay* Vent - bottom Vent - side Vent - slam bar Vent - top Bolt, square head - 10mm M6 Nut - M4* Nut - M6 Nut caps Screws, self tapping - 19mm M3.5 Silicone, gun Silicone, tube...
  • Page 25 ROOF VENT ASSEMBLY This is a view of the underside of the vent This is a view of the underside of the vent bottom meeting the vent side 610 X 610 Looking at the vent top from the outside Looking at the vent bottom from the outside This is a view of the underside of the vent top Looking down onto the vent bottom from outside meeting the vent side...
  • Page 26: Main Building Assembly

    MAIN BUILDING ASSEMBLY Part Length Part Name 8 X 6 8 X 8 8 X 10 8 X 12 Rear End Front End Side Glazing bar, roof - 8' W 1,500 Ridge - 6' L 1,888 Ridge - 8' L 2,508 Ridge - 10' L 3,128...
  • Page 27 MAIN BUILDING ASSEMBLY Very Important: Bolts will need to be slid into each roof bar for the ridge cantilever, two more bolts to attach the hanging basket rail, one more bolt is needed to attach the eave cantilever bracing between the roof and the side. Please note: At this stage you will need to insert an extra bolt into each bar either side of a vent opening.
  • Page 28 MAIN BUILDING ASSEMBLY...
  • Page 29 MAIN BUILDING ASSEMBLY FITTING OPTIONAL CRESTING AND FINIALS When fitting the finials and cresting you need a hacksaw, silicone gun and tube. Before you get into position you need to take a hacksaw and trim off the male end of one of the cresting sections.
  • Page 30: Louvre Assembly

    LOUVRE ASSEMBLY Part Name Part Length Required Top/Bottom cill Side bar Side bar - with handle Screws, self tapping - 10mm M4 Crop head bolts - 10mm M6 Nuts - M6 Toughened glass (L) 573 X 100 1. Trim rubber to side lengths and place top and bottom cill into position on side bars. Secure with self tapping screws.
  • Page 31 LOUVRE ASSEMBLY Self tapping screws - 10mm M4 Side bar Top cill Use this slot to attach the louvre to the greenhouse frame 573 X 100 Bottom cill Self tapping screws - 10mm M4 Side bar Top cill Top cill Side bar Pinch before inserting glass...
  • Page 33: Glazing

    GLAZING You are about to begin glazing your greenhouse. It is vital that you take as many safety precautions as possible, especially when handling glass. When glazing the roof we recommend that one individual stands on some ladders inside the greenhouse (It is important that this person is not directly underneath the glass, it is best to stand to one side and help guide the glass in with one hand), while someone else passes the panes up from the outside.
  • Page 34: Final Fixing

    FINAL FIXING VENT INSTALLATION MM¹ 610 X 610 610 X 545 610 X 545 Vent hinge If you are using a casement stay attach the vent pegs to the slam bar using M4 countersunk screws and M4 nuts (you may find it easier to use needle nose pliers to hold the nut as you tighten the bolt).
  • Page 35 FINAL FIXING DOOR INSTALLATION Take one of the doors and locate the first set of door wheels on the rails in the door track (Diagram OO). When doing this you also need to locate the door guide on the bottom of the door in the door runner (Diagram PP). When both of these are located slide the door further along the track until you can locate the second set of door wheels.
  • Page 36 FINAL FIXING DOOR INSTALLATION...
  • Page 37 FINAL FIXING HANGING BASKET BAR The hanging basket bars are fixed below the vents on the undersides of the roof. Use the two remaining bolts in the bolt channels of the roof bars to attach the hanging basket bar. Start at one end loosely attaching nuts and work along to the other end. (If you are using an autovent you may need to adjust the position of the bars to allow the autovent to work freely).
  • Page 38 FINAL FIXING DOWNPIPE INSTALLATION Part Name Part Length Required Screws, self tapping - 19mm M3.5 Gutter outlet Gutter stop end Downpipe 1500 45 degree double collar Downpipe bracket Firstly you need to decide whether you want the water in your gutters to drain to the front or the rear of the greenhouse.
  • Page 39 FINAL FIXING ANCHORING BUILDING TO SLAB / CONCRETE BASE For this final stage you will need eight No.10 X 2” screws, eight brown wall plugs, a 7mm masonry drill bit and a hammer drill. Fixing the greenhouse to the ground is very simple to do. When you built the front, rear and side assemblies you will have attached base brackets (Part number: 300) in specific places around the building.
  • Page 40 The Greenhouse People Ltd Blythe Business Park Cresswell Stoke-on-Trent Staffordshire ST11 9RD Tel: 01782 388811 Fax: 01782 388818 info@greenhousepeople.co.uk Website: www.greenhousepeople.co.uk E-mail: info@thegreenhousepeople.co.uk...

Table of Contents