Encoder cable

Advertisement

Available languages

Available languages

Assembly instructions (Translation: en)
758663
1203NH
Encoder cable
NEBM-M12G8/W8-E-...-LE
1. Parts list
NEBM-M12G8:
2
1
3 4
16543d_2
NEBM-M12W8:
2
1
3 4
16543d_1
2. Pin allocation
16543d_3
Motor end
16543d_4
3. Instructions for cables in energy chains
Note
If there is a chain breakage:
The cables can be damaged due to overstretching.
 Replace all the cables after a chain breakage.
With a vertical energy chain:
The cables will stretch during operation.
 Ensure that there is more clearance "X" than specified in assembly step 3.
 Check the length of the cables after a short operating period and adjust, if
necessary.
4. Fitting the cables in energy chains
1. Lay the chain out lengthwise.
2. Place the cables in the energy chain, making sure they are not twisted.
Lay out or hang the cables first, if necessary.
3. Lay the cables loose next to each other in the energy chain, if possible
separated from each other by separators or holes. Ensure the clearance
"X" of the cables is 10% of the cable diameter "D".
†‡
Festo AG & Co. KG
Postfach
D-73726 Esslingen, Ger-
many
++49/(0)711/347-0
www.festo.com
1 Cable
Motor end:
2 Socket
8-pin
Controller end:
3 Wire end sleeve
DIN 46228 A0,14-7
4 Push-in sleeve red (1x)
DIN 46245 6.3x0.8
2
Controller end
Avoid placing cables on top of each other if separators are not used.
7435d_3
4. After laying the cables, place the chain in the working position.
5. Make sure that the bending radius of the cables is not smaller than the
permitted bending radius "R".
6. Make sure that the cables can move freely in the bending radius "KR", the
cables must not be forced through the chain.
(1x)
(1x)
7435d_4
7. Leave the cables loose in the chain, do not tie them together.
(8x)
8. Fasten the cables on both ends of the chain ( Fig. 1).
9. With long energy chains in which the upper run lies on the lower run, fas-
ten the cables only at the driver end ( Fig. 2).
10. Make sure that the cables are on no account moved all the way to the
fastening point. Make sure the spacing between the end point of the
bending movement and the attachment is as large as possible
(however, this must be equivalent to mounting space "A" at the very
least).
Fig. 1
7435d_2
5. Technical data
NEBM-...-E-...-LE
Cable composition
Cable diameter
Min. cable bending radius
Distance from the fastening
Protection class
Ambient temperature
In energy chains
With flexible cable installation
Information on material
Cable sheath
KR › R
Fig. 2
7435d_1
M12G8
M12W8
[mm²]
4x (2x 0.14)
Screened
D
[mm]
6.8 ± 0.2
R
[mm]
68
A
[mm]
136
2
IP65
[°C]
−40 ... +80
[°C]
0 ... +60
[°C]
−5 ... +80
PUR