Indoor Unit Installation; Wiring Connection - LG ARNU07GL1G2 Installation Manual

Hide thumbs Also See for ARNU07GL1G2:
Table of Contents

Advertisement

Indoor Unit Installation

• Select and mark the position for fixing bolts.
• Drill the hole for set anchor on the face of ceil-
ing.
CAUTION : Tighten the nut and bolt
to prevent unit falling.

Wiring Connection

Connect the wires to the terminals on the control board individually according to the outdoor unit connec-
tion.
• Ensure that the color of the wires of outdoor unit and the terminal No. are the same as those of indoor
unit respectively.
Indoor unit
Terminal Block Indoor
1(L)
2(N)
INDOOR POWER INPUT
WARNING : Make sure that the screws of the terminal are free from looseness.
Clamping of cables
1) Arrange 2 power cables on the control panel.
2) First, fasten the steel clamp with a screw to the inner boss of control panel.
3) For the cooling model, fix the other side of the clamp with a screw strongly. For the heat pump
model, put the 0.75mm
the other boss of the control panel.
CAUTION : The Power cord connected to the unit should be selected according
to the following specifications.
Outdoor unit
Outdoor unit
Terminal Block Indoor
3(A)
4(B)
SODU SODU
2
cable(thinner cable) on the clamp and tighten it with a plastic clamp to
• Insert the set anchor and washer onto the sus-
pension bolts for locking the suspension bolts
on the ceiling.
• Mount the suspension bolts to the set anchor firmly.
• Secure the installation plates onto the suspen-
sion bolts (adjust level roughly) using nuts,
washers and spring washers.
Old building
1 Set anchor
2 Plate washer
3 Spring washer
4 Nut
5 Suspension
bolts
Central controller
Indoor unit
IDU
IDU
INTERNET
DRY1 DRY2 GND
Installation
New building
12V
Installation Manual 9

Advertisement

Table of Contents
loading

Table of Contents