Download Print this page

Honeywell Krom Schroder DG B Series Operating Instructions page 2

Pressure switches for gas

Advertisement

Installation
CAUTION
Please observe the following to ensure that the DG
is not damaged during installation and operation:
Continuous operation with gases containing
more than 0.1 %-by-vol. H
centrations exceeding 200 µg/m³ accelerate
the ageing of elastomer materials and reduce
the service life.
Use approved sealing material only.
Dropping the device can cause permanent dam-
age. In this event, replace the entire device and
associated modules before use.
Check max. ambient temperature  – see
page 3 (Technical data).
When using silicone tubes, only use silicone
tubes which have been sufficiently cured.
Vapours containing silicone can adversely affect
the functioning of electrical contacts.
Condensation or vapours containing silicone
must not be allowed to get into the housing.
At subzero temperatures malfunctions/failures
due to icing can occur.
When installing outdoors, place the DG in a
roofed area and protect from direct sunlight
(even IP 65 version). To avoid condensation, a
cover with pressure equalization element (Order
No. 74923391) can be used.
Avoid strong impact on the unit.
In case of highly fluctuating pressures, install a
restrictor orifice (Order No. 75456321).
▷ Installation position as required, preferably with
vertical diaphragm. Then the switching point p
corresponds to the scale value SK set on the
hand wheel. In other installation positions, the
switching point p
S
correspond to the scale value SK set on the
hand wheel. Check the switching point.
p s = SK
p s =SK + 0,18 mbar p s = SK - 0,18 mbar
▷ The DG must not be in contact with masonry.
Minimum clearance 20 mm.
▷ Ensure that there is sufficient installation space.
▷ Ensure unobstructed view of the hand wheel.
1 Disconnect the system from the electrical power
supply.
2 Shut off the gas supply.
3 Ensure that the pipeline is clean.
1 and 2
2
Positive pressure (Rp ¼)
1
3
3 and 4
4
Negative pressure (Rp
S or ozone con-
2
will change and no longer
)
1 /8
Positive pres-
sure DG..U
Negative pres-
sure DG..U
Differential pres-
sure DG..U
Positive pressure
DG..B
4 If the electrical contacts in the DG could be soiled
by dirt particles in the surrounding air or in the
medium, use a filter pad (Order No. 74946199)
at port 3/4. On IP 65 units, the filter pad is fitted
as standard, see type label.
Wiring
▷ If the DG..G has switched a voltage > 24 V and a
current > 0.1 A at cos φ = 1 or > 0.05 A at cos φ =
0.6 once, the gold plating on the contacts will have
been burnt through. It can then only be operated at
this power rating or higher power rating.
▷ Pressure switch DG can be used in Zone  1
(21) and 2 (22) hazardous areas if an isolating
amplifier is installed upstream in the safe area
as "Ex-i" equipment pursuant to EN 60079-11
(VDE 0170-7):2012.
▷ DG as "simple electrical equipment" pursuant to
EN 60079-11:2012 corresponds to the Tempera-
ture class T6, Group II. The internal inductance/
capacitance is Li = 0.2 μH/Ci = 8 pF.
CAUTION
Please observe the following to ensure that the DG
S
is not damaged during operation:
Note the switching capacity, see page  3
(Technical data).
In the case of low switching capacities, such as
24 V, 8 mA, for example, we recommend using an
RC module (22 Ω, 1 μF) in air containing silicone or oil.
1 Disconnect the system from the electrical power
supply.
2
5
M16 x 1,5:
ø 4–10 mm
▷ Contacts 3 and 2 close when subject to increas-
ing pressure. Contacts 1 and 3 close when sub-
ject to falling pressure.
GB-2
Connect
Seal
1
2
2
1
3
4
4
3
1 or 2 for higher absolute pressure.
3 or 4 for lower absolute pressure.
Seal the ports that are not in use.
1
3
4
6
7
Free
3 or 4
3 or 4
1 or 2
1 or 2

Advertisement

loading

This manual is also suitable for:

Krom schroder dg u seriesKrom schroder dg 6 seriesKrom schroder dg 10 seriesKrom schroder dg 30 seriesKrom schroder dg 50 seriesKrom schroder dg 150 series ... Show all