Wells WM-TR Operation Manual page 10

Wells water -max wm-tr operation manual
Hide thumbs Also See for WM-TR:
Table of Contents

Advertisement

INSTALLATION (continued)
CAUTION:
Hot Surface
Exposed surfaces can be hot
to the touch and may cause
burns.
INSTALLATION START-UP AND CHECKOUT
Before turning on power or water to Water-Max™, visually verify:
a. Unit is level, air outlet guard in place, with all legs touching the
counter (countertop installation); or,
Wall brackets securely mounted to wall and unit properly and
securely mounted to brackets (all screws tight) with outlet guard
installed (wall mount installation).
b. All electrical connections properly made and tightened.
Water connections properly made.
Turn on water to Water-Max™. Visually inspect unit for leaks.
Apply power to Water-Max™. Install tank on Water-Max™ shelf (leave
tank lid off at this time). Press power switch to ON and observe
operation:
a. POWER INDICATOR will glow when POWER SWITCH is ON.
TANK INDICATOR will glow when tank is properly installed.
b. After a five second delay, Water-Max™ tank should begin filling.
STATUS INDICATOR will glow steadily while tank is filling,
indicating normal operation.
c. During initial tank fill, CAREFULLY separate the tank from the
Water-Max™shelf. Verify that water flow stops when the tank
allows the nozzle to rotate up.
d. Reinstall the water tank. Verify that water flow stops when water
reaches the water level probe.
Press power switch to OFF. Discard all water generated thus far by
dispensing containers of water from the faucet until the tank is empty.
Remove the tank from the shelf. Install tank lid on tank.
Press power switch to ON. Reinstall tank on Water-Max™ and allow
tank to fill. Monitor time to fill and record on the INSTALLATION
CHECKOUT form.
Test water temperature at faucet. Water should be at 201ºF.
8

Advertisement

Table of Contents
loading

This manual is also suitable for:

Water-max

Table of Contents