Installation; Electric Specifi Cation - Balteco Rhea Manual

Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 16

3. Installation

Installation and setting up of the bathtub must be carried out by individuals authorized by the
manufacturer or approved specialists.
PS! Before installation make sure that the electrical wiring system is grounded, complies with the
standards in force and there is no voltage in the lines.
Place the bathtub into desired position; adjust the supports to achieve the required height and level
the bath horizontally. If necessary, install all the required electrical connections. Use a fl exible tube
to connect the bath's drain with sewage system. For bath mixer: connect the cold and hot water
inlets with water the water supply system by using fl exible pressure hoses. Fasten the supports with
counter nuts. Fill in the spaces between the bathtub and the wall.
In the case of a bathtub walled into the bathroom it is important to install a hatch or door which can
be opened with a tool to allow the maintenance of the bathtub and, where necessary, its removal.
When walling up a bathtub, leave a suffi cient ventilation space into the wall to provide for the
cooling of the pump and the blower.
For fi tting the panel, press the panel under the edge (1) of bath and tighten it with screws.
4. Electric specifi cation
The bath is designed for use in electrical wiring system with a neutral conductor and a protective earth conductor
(System TN-S). This unit should be installed and grounded by an authorized professional by the manufacturer or a certifi ed
electrician.
PS! Before making the electrical connections check the correspondence of conditions brought on the marking plate (located
on the cover of the plastic junction box) to the appropriate nominal values.
1
2
L
N
The bath is permanently connected to the power supply network according to Figure 1 or Figure 2. Attention must be paid to
local regulations and allowed load for a phase.
Figure 1
1. Mains 230 v 50 Hz
2. Protection switch
3. GFCI
4. Bath terminals
Connect the feeder to the marked plastic junction box through a free cable gland, it is important to tighten the glands gasket
round the cable, in a way that visually proves the connection to be waterproof. Also pay attention to fi x the cover of the plastic
box after connecting the feeder.
This unit must be connected to supply circuits that are protected by a ground fault circuit interrupter (GFCI) 30 mA and an
overload current circuit breaker.
For local equipotent bonding it is important to connect all extraneous conductive parts within the room
Metal water-, gas-, drainpipes;
Metal pipes of central heating/air conditioning;
Metal constructions of the building;
Other metal parts nearby that might be a subject to electric potential.
PS! While installing a bath mixer, connect the mixer with earthing bars of the bath's frame, using wire of 2,5 mm² of
cross section.
3
4
L
N
17
1
2
L1
L2
N
Figure2
1. Mains 230/400V (2N) 50Hz
2. Protection switch
3. GFCI
4. Bath terminals
EN
3
4
L1
L2
N

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

LineaRomaEvo

Table of Contents