Download Print this page

HP ProLiant DL100 G2 1TB Installation Instructions page 3

Data protection
Hide thumbs Also See for ProLiant DL100 G2 1TB:

Advertisement

1 Slide rail installation
NOTE:
Depending on the rail kit provided, your rackmount rail
assemblies may vary slightly from those in the following illustrations.
1.
Install the two slide rails to the sides of the rack.
NOTE:
Two different types of rail kit designs are shown in the
illustration below, but both install similarly. Within a kit, the two rail
assemblies are identical, but depending on the side of the rack, are
rotated so the sliding portions of the rails are towards the center of the
rack.
a. Adjust the side rail assemblies to the approximate rack depth.
b. At one side of the rack, align the rail holes with the holes in the
rack and secure with the provided mounting hardware.
IMPORTANT:
HP recommends leaving the rail mounting screws
loose until the server is completely installed. This eases installation by
preventing binding of the server in the rack.
c. Align holes at the other end of the rack with the rail assembly
and secure with mounting hardware.
d. Install the other side rail assembly on the other side of the rack
as described in the previous steps.
2.
Locate the inner slide rails:
• If the rail assembly you mounted in the rack comes as one unit,
remove the inner slide rails from the outer slide rails. To do so,
extend the inner slide rails from the front of the rack until they
lock in place. Then, press the inner rail release latch, as shown,
and pull the inner slide rails straight out.
.
• If the inner slide rails in your kit are separate from the rail
assemblies installed in the racks, remove them from the kit box
and proceed to the next step.
2 Server preparation
1.
Attach the two bezel brackets to the server using the supplied
bracket screws, as shown 1.
2.
Attach an inner slide rail (lock facing out) to each side of the
server. Insert the slide rail screws through the inner slide rails as
shown 2, and then tighten.
3.
Attach the bezel 3 to the bezel brackets, and then lock the bezel to
the server (if desired).
5201b
2
1
3
10685A
2
1
5202

Advertisement

loading

This manual is also suitable for:

Proliant dl100 g2 2tbProliant dl100 g2 3tbProliant dl100 g2 6tb