Download Print this page

Huawei AR Series Hardware Installation And Maintenance Manual page 56

Industrial switch routers
Hide thumbs Also See for AR Series:

Advertisement

Huawei AR500&AR530&AR550 series Industrial Switch
Routers
Hardware Installation and Maintenance Guide
----End
4.3 Scenario 3: Mounting the Router in a Cabinet (Using a
530 Horizontal Rack-Mounting Kit)
Context
There must be a clearance larger than or equal to the router's width at the left and right of the
router after the installation. The clearance above the router must be at least two times the
router's height and the clearance below the router must be greater than or equal to the router's
height.
Make sure the following prerequisites are met before the installation:
Issue 05 (2015-12-01)
NOTICE
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
4 Installing an AR530 Series Industrial Switching Router
2
A R 5 3 0
S e ri e s
ED
IN FR AR
2C -H
AR 53 1-F
PW R
R U N /A LM
R S4 85 -0
R S4 85 -1
1
48

Advertisement

loading