Can Industrial W40H21P Series Assembly Manual page 6

Shelter

Advertisement

EQUIPMENT AND TOOLS FOR INSTALLATION
1. Measuring Tape
2. String for alignment
3. Stake
4. Ladder or Scissors Lift
5. Sledge Hammer
6. Drill
7. Wrench
8.Knife
9. Hoist
INSTALLATION PROCESS
A----BASE INSTALLATION
Please refer to the diagram (Figure 2) to place the base plates:
Figure 2
1. The measurement is from center to center of tubes on the base palates. Referring to the above diagram and
confirm the place of base plates. There are four holes on the plates for stake pegs.
Foundation placement
As Figure 2 shows each Base plate is equipped with 4 pieces of Stake pegs with ratchets on.(No.21)
1. Mark the stake peg hold through the base plate by using the stake peg. Move the base plates away and the mark
determines where the stake peg will be.
2. Note: The stake peg apply for normal conditions, not suitable to the rock ground, frozen soil and concrete
ground.