Download Print this page

Advertisement

Quick Links

SHELTER
ASSEMBLY MANUAL
Model#407021P
(W40H21P SERIES)
Size: W12.2mxH6.4m xL21.35m

Advertisement

loading

Summary of Contents for Can Industrial W40H21P Series

  • Page 1 SHELTER ASSEMBLY MANUAL Model#407021P (W40H21P SERIES) Size: W12.2mxH6.4m xL21.35m...
  • Page 2: Specification

    SPECIFICATION Width: 12.2m Height: 6.4m Length: 21.35m Door dimension: W4xH4m IMPORTANT----READ MANUAL FIRST Improper site preparation, assembly and maintenance may invalidate warranty and cause unnecessary and costly mistakes. If you have any questions contact your local dealer. For User Friendly assembly we have identified each individual component with the part code as indicated in the parts list.
  • Page 3 407021P Spare Parts List Part Description Roof Bent Tube 1A Roof Bent Tube for Front & Back Wall Upper-Middle Connecting Truss 12 set 2A Upper-Middle Connecting Truss for Front & Back Wall 12 set Lower-Middle Connecting Truss 3A Lower-Middle Connecting Truss for Front & Back Wall 16 set Side Wall Bent Tube 16 set...
  • Page 4 Lower Upright for Front & Back Door at Left 13A Lower Upright for Front & Back Door at Right Upper Door Track for Front & Back Door Horizontal Tube for Front & Back Wall Tube for Assembly the Winch Surpporting Steel Wire for Side Wall 14 pcs Clips 88 pcs...
  • Page 5 Figure 1:Sketch of trussed frame shelter Size: W12.2mxH6.4mxL21.35m...
  • Page 6 EQUIPMENT AND TOOLS FOR INSTALLATION 1. Measuring Tape 2. String for alignment 3. Stake 4. Ladder or Scissors Lift 5. Sledge Hammer 6. Drill 7. Wrench 8.Knife 9. Hoist INSTALLATION PROCESS A----BASE INSTALLATION Please refer to the diagram (Figure 2) to place the base plates: Figure 2 1.
  • Page 7 B---FRAME INSTALLATION Figure 4 Figure 5 1.Figure 4 shows to connect the Top roof tube(No.1A),Roof curing tube(No.2A), Roof curving tube at both doors (No.3A) , Sidewall tube (No.4) and Standing leg(No.5) with Bolt M12x30mm(No.23), then put the arch into tube of the Base flange by hoist, and assemble every group arch by turns(see Figure 5).
  • Page 8 C--- INSTALLING FRONT AND BACK COVER After Assembly the Arches, pls assembly the front and back wall as the picture above show.
  • Page 9 Figure 8 Front and Back Cover Figure 9 Front door 2.Insert the tubes(Part No.25) into front and back door through the pockets on covers, tidy the front door and back door covers by using Rope(No.28), make the cover well fold to the frame and tension the cover.
  • Page 10 D--- INSTALLING THE ROOF COVER NOTE: Do not install the cover onto the frame of your building in high wind conditions. Figure 10...
  • Page 11 Figure 11 1. As Figure 10 shows, when Roof cover is over top of Frame assembly (see Figure 10) Figure 12 2. As Figure 12 shows, align one side of Roof cover evenly front to back, add band(No.30) for tie down ratchet at each point alone the cover opening, Put band for tie down ratchets over cover tension tubes at each base plate alone one side.

This manual is also suitable for:

407021p