Mower Preparation - Toro Z MASTER 79402 Operator's Manual

52” vac–bagger for z-118 and 616/620 zero radius tractors
Table of Contents

Advertisement

Mower Preparation

For ease of marking and assembly of vacuum bagger
remove mower from traction unit.
1.
Remove the discharge chute from the mower and
save chute and hardware for installation when
the vacuum bagger is removed.
2.
Measure the location of lower deflector hole in
the front of the mower deck. Center punch and
drill one (1) 11/32" hole (Fig. 1).
2
Figure 1
1. Mark and drill 11/32" hole
2. 11" (27.9 cm)
1
3
3. 7/8" (22 mm) from lowest
part of deck
3.
Position the deflector underneath the mower and
align the front deflector mounting hole with the
drilled hole in the mower.
4.
Fasten the deflector to the mower with 5/16"-18
x 3/4" (19 mm) hex bolt and locknut. Insert the
hex bolt from inside the deflector (Fig. 2).
5.
Hold the deflector against the back and top of
mower discharge opening. Using the deflector as
a guide, mark the remaining (2) front and rear
deflector mounting holes in the mower (Fig. 5).
4
1
Figure 2
1. Deflector
2. 5/16"-18 x 3/4" (19 mm)
Hex Bolt
Installation
2
4
3
3. 5/16"-18 Locknut (3)
4. Mark and drill 11/32" hole
5