Campania International GFRCFT-1100 Long Beach Assembly Instructions

Campania International GFRCFT-1100 Long Beach Assembly Instructions

Advertisement

GFRCFT-1100 Long Beach Fountain
Revised August 30, 2017
(1 pieces)

COMPONENTS AND PARTS LIST

66"L x 26.5"W x 48"H
290 lbs

Pump Kit Parts List

Tools you will need

Level
PK800 pump (1)
6" length of 1/2" Black Non-kink tubing (1) **
2" length of 5/8" clear tubing (1) **
This fountain should be covered
2" length of 3/4" clear tubing (1) **
with a water proof tarp over the
2" length of 3/8" copper pipe
winter.
#5 Drain stopper (1)
Hose clamps (2) *
* Hose clamps may be used as flow restrictors
** The tubing has been preassembled

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the GFRCFT-1100 Long Beach and is the answer not in the manual?

Questions and answers

Summary of Contents for Campania International GFRCFT-1100 Long Beach

  • Page 1 GFRCFT-1100 Long Beach Fountain Revised August 30, 2017 (1 pieces) COMPONENTS AND PARTS LIST 66”L x 26.5”W x 48”H 290 lbs Pump Kit Parts List Tools you will need Level PK800 pump (1) 6” length of 1/2” Black Non-kink tubing (1) ** 2”...
  • Page 2 GFRCFT-1100 Long Beach Fountain (1 pieces) Revised August 3, 2017 ASSEMBLY INSTRUCTIONS 1. Make sure you are assembling your fountain on a level surface. 2. Assemble the pump kit a. Attach the 3/4" clear end of the tubing assembly to the pump.

Table of Contents