Assembly and Disassembly Procedures
Required Tools and Supplies
Leakage Tests
Shroud Removal
Revision A
Assembly/Disassembly: Assembly and Disassembly Procedures
To maintain and repair the GE T2100 Treadmill, you will need the
following:
Standard hand tools, including:
!
Socket and Driver set – 9mm (3/8") or 12mm (1/2") drive,
"
including extensions and 9mm (3/8"), 11mm (7/16"), 12mm (1/2"),
14mm (9/16") sockets
Wrench set – with opposite "box" and "open" ends in9mm (3/8"),
"
11mm (7/16"), 12mm (1/2"), 14mm (9/16")
Screwdrivers – small and medium size "flat" tip and "Phillips" tip
"
Needlenose pliers
"
Crescent Wrench/Channel Locks – 40mm (1 1/2") minimum
"
Hex Key set – 3mm (1/8"), 4mm (5/32"), 6mm (1/4")
"
Carpenter's level
"
DVOM
!
Leakage current tester PN MT-1216-01 (for 120 V), PN MT-1216-02
!
(for 240 V), or equivalent
CASE Treadmill Interface cable PN 700609-001C
!
Antiseptic cleaner
!
Dust remover (compressed air)
!
GE Medical Systems Information Technologies recommends that you
perform the electrical leakage tests whenever internal assemblies are
serviced.
See
"Leakage Tests"
To remove the GE T2100 Treadmill shroud for the internal visual
inspection or for service:
Disconnect the power cord from the rear connector panel.
"
Remove the screws on the shroud back and remove the back
"
panel.
Remove the 2 bolts on each side of the shroud.
"
Lift off the shroud.
"
GE T2100 Treadmill
2021403-031
on page 3-12.
7-3