Section 9 - Fireman Pole Assembly - Action Sports Super Play Fort II Manual

Table of Contents

Advertisement

SECTION 9 – FIREMAN POLE ASSEMBLY
Assemble the Fireman Pole as shown in Figures 24 to 26.
Figure 24
Figure 25
Figure 26
Play Fort when completed should resemble the diagram below. Before use, do a final inspection of the unit,
ensuring all plastic, and assembly tools are removed from the play area, and also that all screws are correctly
tightened.
©ACTION SPORTS EQUIPMENT PTY LTD –
www.actionsports.com.au
Page: 29

Advertisement

Table of Contents
loading

This manual is also suitable for:

S001049

Table of Contents