Section 1- Main Frame Assembly - Action Sports S000084 Assembly, Installation, Care, Maintenance, And Use Instructions

Action 3-unit swing set with slide & bonus sling swing
Table of Contents

Advertisement

SECTION 1- MAIN FRAME ASSEMBLY

Assemble the Main Frame by using the provided tools Wrench and Allen Key as shown in
Figure 1.
Note: 1) At least two people are required to erect the Main Frame and Leg Tubes.
2) Make sure legs are positioned so that frame legs sit flush on ground, with peg hole
facing out and away from swing.
Figure 1
At the beginning, do not over tighten the screws when assembling the Legs (Part# A11 & A12)
to the Top Support Tube (Part# A10). This will make it easier to make final alignment and
adjustment. Once all screws have been properly aligned, tighten them securely.
ACTION SPORTS EQUIPMENT PTY LIMITED – www.actionsports.com.au
Page: 10

Advertisement

Table of Contents
loading

Table of Contents