Ceiling Opening Dimension And Hanging Bolt Location - LG ARNU05GL1G2 Installation Manual

Hide thumbs Also See for ARNU05GL1G2:
Table of Contents

Advertisement

Installation
Ceiling dimension and hanging bolt location
Installation of Unit
Install the unit above the ceiling correctly.
POSITION OF SUSPENSION BOLT
• Apply a joint-canvas between the unit and duct to absorb
unnecessary vibration.
• Apply a filter Accessory at air return hole.
Dimension
A
B
Capacity(kBtu/h)
5/7/9
733 772 628 700 36 190 20 660 155 700
12/15/18
933 972 628 700 36 190 20 860 155 900
21/24
1133 1172 628 700 36 190 20 1060 155 1100
※ Install the unit leaning to a drainage hole
side as a figure for easy water drainage.
POSITION OF CONSOLE BOLT
• A place where the unit will be leveled and that can support
the weight of the unit.
• A place where the unit can withstand its vibration.
• A place where service can be easily performed.
8
Indoor Unit
(Unit:mm)
C
D
E
F
G
H
E
D
C
I
J
G
J
A
B
H
Drainage hole
M10 Nut
X 4
M10 washer
X 4
M10 washer
X 4
M10 Nut
X 8

Advertisement

Table of Contents
loading

Table of Contents