LG ATNH12GPLE1 Installation Manual page 13

4way ceiling cassette
Table of Contents

Advertisement

Connecting Pipes to the Indoor Unit
- Preparation of Piping
Main cause of gas leakage is defect in flaring
work. Carry out correct flaring work in the fol-
lowing procedure.
Cut the pipes and the cable.
- Use the accessory piping kit or the pipes pur-
chased locally.
- Measure the distance between the indoor
and the outdoor unit.
- Cut the pipes a little longer than measured
distance.
- Cut the cable 1.5m longer than the pipe
length.
Copper
tube
90
Burrs removal
- Completely remove all burrs from the cut
cross section of pipe/tube.
- Put the end of the copper tube/pipe to down-
ward direction as you remove burrs in order
to avoid to let burrs drop in the tubing.
Point down
Slanted Uneven Rough
Pipe
Reamer
Putting nut on
- Remove flare nuts attached to indoor and
outdoor units, than put them on pipe/tube
having completed burr removal.
(Not possible to put them on after flaring
work)
Copper tube
Flaring work
- Carry out flaring work using flaring tool as
shown below.
Outside diameter
mm
inch
Ø6.35
1/4
Ø9.52
3/8
Ø12.7
1/2
Ø15.88
5/8
Ø19.05
3/4
Firmly hold copper tube in a bar(or die) as indi-
cated dimension in the table above.
Bar
Bar
"A"
Copper pipe
Clamp handle
INSTALLATION
13
Flare nut
A
mm
1.1~1.3
1.5~1.7
1.6~1.8
1.6~1.8
1.9~2.1
Handle
Yoke
Cone
Red arrow mark

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Atnh18gple1Atnh21gnle1Utn12whUtn18whUtn21wh

Table of Contents