CHECKING THE OPERATION OF SAFETY VALVES

Manually operate the valve lever on the Pressure Relief Valve for a few seconds. Check that water is discharged and that it
flows freely through the tundish and discharge pipework. Check that the valve reseats correctly when released.
Repeat the procedure for the Temperature & Relief Valve, if installed. Note: The water discharged may be very hot.
7.4

FILLING THE AUDAX AND CENTRAL HEATING SYSTEM

Follow the Immergas Audax Instructions, "Installation of the Unit" section. Ensure that water quality guidelines are fol-
lowed.
7.5

ANNUAL MAINTENANCE

The Inoxstor should be inspected and serviced annually. As a minimum, check operation of both pressure relief valve and
T&P valve (if installed), check system for leaks, check expansion vessel and check operation of immersion thermostat.
Important: After servicing, preliminary electrical system checks must be carried out to ensure electrical safety (i.e. polarity,
earth continuity, resistance to earth and short circuit).
Annual maintenance of the Immergas Audax Heat Pump should be carried out as specified in the Immergas Audax Heat
Pump instructions.
8.

AUDAX - SUGGESTED SETTINGS

The following is a quick reference for settings to use when commissioning the Audax heat pump.
These suggested settings will configure the Audax to use external timeclocks, Weather Compensation, and enable DHW
with a set point of 50°C. These settings will ensure compatibility with the Inoxstor Pre-Plumbed Water heater.
Menu
Lingua
Menu
Service
Menu
Service
Menu
Service
Menu
Service
Menu
Service
Menu
Service
Menu
Set point DHW
Menu
Time and Program
Menu
Time and Program
Menu
Time and Program
Inoxstor Pre-Plumbed Water Heater
Menu Tree
Definition of Zone
Definition of Zone
Defining Plant
Defining Plant
Thermoreg. Parameters
Thermoreg. Heat
Date and Time
Time Slots
DHW Program
Installation, Usage and Maintenance Instructions
Room Control Switch
Mode Control
External Probe
Enabling DHW
Modulation with room probe
1
Monday - Sunday
Set to
Eng
T.A.
External
PdC
Yes
No
Adjust weather compensation curve
if required.
Set Comfort to 50°C.
Set Date & Time
Create on period from 00:00 to 24:00
Use time slot 1