LG AC MANAGER 5 Installation Manual page 9

Hvac controller

Advertisement

Installing AC Manager 5 and
connecting cables
AC Manager 5 shall be installed in an ade-
quate place, and Ethernet cable (LAN cable)
shall be connected for the connection to inter-
net or central controller. To fix AC Manager 5,
the following 2 methods may be used. Install
in DIN RAIL or fix to the wall considering the
environment of the site.
Power
LAN cable
PACM5A000
INSTALLING AC MANAGER 5
Installing AC Manager 5 in DIN RAIL
AC Manager 5 can be installed in DIN RAIL
with width 35 mm and height 7.5 mm.
To install AC Manager 5 in adequate place,
proceed according to the following instruc-
tions.
Here, it describes the installation method of
AC Manager 5 with the example of installing
AC Manager 5 in DIN RAIL.
• Decide the space to install AC Manager 5.
• Before installing AC Manager 5, check if it is
the adequate place to connect AC Manager
5 with the power, and LAN cable.
• Install DIN RAIL.
• Hook the top part of AC Manager 5 on DIN
RAIL.
• Push the main body of AC Manager 5 until
you hear the sound of installation.
• Pull AC Manager 5 to check if it is fixed.
CAUTION
!
• After installing to DIN RAIL, do not fix to
the wall using screws. AC Manager 5
may be damaged.
• DIN Rail fixing Screw Spec: M3, screw
head height 2.0 ~ 1.75 mm, screw head
diameter 7.0 ~ 5.5 mm
9
Hooking on
DIN RAIL
Fixing to DIN RAIL