BAS C3 Instruction Manual page 12

Cell stand
Table of Contents

Advertisement

Section 3. Installation
Figure 4. Connection of C3 to epsilon
8
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com
C3 to epsilon EC
Two cables are required to connect the C3 to epsilon EC. Stirring and purging can be
automatically controlled by the epsilon. The control cable is a 25-line ribbon cable
(ER-9515) between the REMOTE connector (25-pin D, male) on the back of the C3 and the
CELL STAND connector (25-pin D, female) on the back of the epsilon. See Figure 4.
Connection of the cell lead cable is also shown in Figure 4. The cell lead cable has a
stainless steel LEMO connector at each end. One end is inserted into the CELL socket on
the back of the C3. The other end is inserted into the CELL socket on the back of the
epsilon. The ends are identical; therefore, it does not matter which end is connected to the
epsilon or the C3.
Cell Stand
Cell
C3 to CV-1B Voltammograph
A single cable connects the C3 to the CV-1B. Stirring and purging are manually controlled.
The cell lead cable has a stainless steel LEMO connector at each end. One end is inserted
into the CELL socket on the back of the CV-1B. The other end is inserted into the CELL
socket on the back of the C3. The ends are identical; therefore, it does not matter which end
is connected to the CV-1B or the C3.
CELL
GAS INLET
REMOTE
POWER ENTRY
MODULE

Advertisement

Table of Contents
loading

Related Products for BAS C3

Table of Contents