Download Print this page

Velleman-Kit K5203 Manual page 7

Dual function strobe

Advertisement

__________________________________________________________________________________________________________________________________________________________
15. FUSE + HOLDER
Mount the fuseholder and insert
the fuse:
q F1: 250mA Slow (T 250mA)
16. 5W RESISTORS
(VERTICAL MOUNTING!)
q R16: 220
q R17: 220
q R18: 220
q R19: 220
F...
R...
17. SWITCH
q SW1: TS8 (ON-ON)
18. STROBE TUBE
(Ch
eck the polarity!)
Avoid touching the tube. Eventually,
it can be cleaned with a dry cloth.
Mind the correct orientation of the
tube. Solder the tube in place, parallel
to the PCB border, as shown.
Connect the loose wire to point W
-
W
q STROBE TUBE
!
CAUTION: under operating
condition, voltages up to 6KV
can be present at point W.
SW...
+
+
TUBE
w
-
7

Advertisement

loading