Handling And Installation; Handling Precautions; Unpacking Procedures - GE PMC423 Series Hardware Reference Manual

Port serial, front/rear i/o
Table of Contents

Advertisement

1 • Handling and Installation

1.1 Handling Precautions

1.2 Unpacking Procedures

10 PMC423 Port Serial, Front/Rear I/O Hardware Reference Manual
CAUTION
Handle the board by the edges or front panel only.
Electronic assemblies use devices that are sensitive to static discharge. Some of the 
components assembled on GE products may be sensitive to electrostatic discharge 
and damage may occur on boards that are subjected to a high energy electrostatic 
field. Observe anti‐static procedures when handling these boards.  All products 
should be in an anti‐static plastic bag or conductive foam for storage or shipment. 
Work at an approved anti‐static workstation when unpacking boards. When the 
board is placed on a bench for configuring, etc., it is suggested that conductive 
material be inserted under the board to provide a conductive shunt.Unused 
boards should be stored in the same protective boxes in which they were shipped.
Any precautions found in the shipping container should be observed. All items 
should be carefully unpacked and thoroughly inspected for damage that might 
have occurred during shipment. The board(s) should be checked for broken 
components, damaged printed circuit board(s), heat damage and other visible 
contamination. All claims arising from shipping damage should be filed with the 
carrier and a complete report sent to GE Technical Support. 
Remove the PMC423 from the shipping box and anti‐static packaging.  Verify that 
it is not damaged and that all items are present by referring to the packing list.

Advertisement

Table of Contents
loading

Table of Contents