Download Print this page

JADO Classic 853/495 Series Installation Instructions page 2

Pressure balanced bath / shower combination trim kit

Advertisement

TOOLS REQUIRED
1/2" Hex Wrench
Teflon Tape
ROUGHING-IN DIMENSIONS
1
For reference
1-5/8" TO 3-1/4"
FINISHED WALL
1/2" NPT
7-1/2" REF.
74" FOR HEAD
CLEARANCE
SHW
(OPTIONAL)
7-7/8"
TUB
18" OPTIONAL
3/4"NPT
7-1/4" REF.
4"
TOP OF
DETAIL "A"
TUB RIM
BOTTOM OF TUB
FINISHED
*1/2" THREAD
WALL
ENGAGEMENT
1-1/2"
SPOUT
*SPOUT NIPPLE
ADAPTER
SHOULD BE
FLUSH WITH
FINISHED WALL
DETAIL "A"
3/4"
NPT
2"
Phillips Screwdriver
Regular Screwdriver
INSTALL DIVERTER
CAUTION
Turn off water at main supply.
When finished tiling the wall, remove PLASTER GUARD (1). Remove
two screws that secure the DIVERTER LID (2) and remove Lid.
Inspect the inside surface of diverter port. Diverter port must be
free of any dirt. Clean if necessary.
Install DIVERTER (3) with SCREWS (4) removed from
DIVERTER LID (2).
Operate DIVERTER (3). DIVERTER (3) should slide in
and out smoothly.
Push on DIVERTER COVER (5).
DIVERTER
PORT
2
3
4
5
1
3
CAUTION: Protect finish on SHOWER ARM,
INSTALL TRIM
SHOWER HEAD and TUB SPOUT when installing.
Push CAP (1) onto VALVE CARTRIDGE (2). Secure CAP (1) to
VALVE CARTRIDGE (2) with SCREW (18) for LEVER HANDLE only.
(Spline in CAP (1) must fully engage spline on cartridge stem).
Mount ESCUTCHEON HOLDER (22) with gasket and ESCUTCHEON (3)
to valve body with SCREWS (4).
Push the COVER (23) as shown over the CAP (1) and align prongs on COVER (23)
with screw holes in ESCUTCHEON (3).
Important! Make sure COVER (23) snaps over the SCREWS (4).
Thread DIVERTER KNOB (17) onto diverter stem.
Remove PIPE CAPS (5) from shower pipe and tub filler pipe.
Install SHOWER ARM (6), SHOWER HEAD (7).
To install TUB FILLER SPOUT (8) first remove SET SCREW (19) and pull
SPOUT ADAPTER (20) from back of spout. Apply sealant to pipe nipple.
With a 1/2" hex wrench thread SPOUT ADAPTER (20) onto pipe nipple.
Install TUB FILLER SPOUT (8) onto SPOUT ADAPTER (20) flush against
finished wall. Tighten SET SCREW (19) to secure TUB FILLER
SPOUT (8) to SPOUT ADAPTER (20).
3a
INSTALL HANDLES (ADJUST HOT LIMIT STOP PRIOR
TO HANDLE INSTALLATION, SEE STEP 4)
For Cross Handle: Thread HANDLE BASE (9)
onto threads of CAP (1) until seated against
it's internal stop. With VALVE in off
position align CROSS HANDLE (11) as
desired. Install CROSS HANDLE (11)
onto VALVE STEM (10) and tighten
HANDLE SCREW (12). Thread
INDEX (13) into CROSS HANDLE.
Lever Handles: Thread HANDLE
BASE (14) onto threads of CAP (1)
until seated against it's internal stop.
Install FRICTION WASHER (21) onto
base of LEVER HANDLE (15). Align LEVER
HANDLE (15) and tighten set screw with
HEX WRENCH (16) supplied with faucet to secure handle.
3
ADJUST HOT LIMIT STOP (MUST BE DONE PRIOR TO TRIM INSTALLATION)
By restricting HANDLE rotation and limiting the amount of hot water allowed to mix
with the cold, the HOT LIMIT SAFETY STOP (1) reduces risk of accidental scalding.
To set the maximum hot water temperature of your faucet, all you need to do is
adjust the setting on the HOT LIMIT SAFETY STOP (1).
Turn CARTRIDGE STEM (2) to
the OFF position (coldest setting)
before making adjustment to HOT
LIMIT STOP (1). Use a flat blade
screwdriver to pry free the HOT
LIMIT SAFETY STOP (1). Pull
forward and rotate
counterclockwise one number to
limit hot water temperature.
Use ARROW (3) on CARTRIDGE (4)
and NUMBERS (5) on HOT LIMIT
STOP (1) for indication.
4
BACK TO BACK INSTALLATION
(SEE ILLUSTRATION STEP 6 FOR REFERENCE)
Remove Handle and Trim from Valve. See
step 2 for reference.
Remove PRESSURE BALANCE UNIT (5). Rotate
PRESSURE BALANCE UNIT (5) 180˚ so that the inlets
face up and the large outlet port faces down.
Push PRESSURE BALANCE UNIT (5) in casting make
sure inlets line up with holes in bottom of casting. Top
flange should butt up against top of casting.
Reassemble FIXATION RING (4) and CARTRIDGE (1).
1 0 9 4 9 7 A
22
3
17
GREASE
O-RING
14
4
21
15
23
9
11
16
12
13
8
CROSS HANDLE
LEVER HANDLES
3
3
5
1
4
4
2
COLDER
(Larger Numbers)
0 1 3 5 7 9 11 13 15
5
TEST INSTALLED FAUCET
Turn VALVE "off".
With HANDLE in "off" position, turn on water supplies
and check all connections for leaks.
Operate HANDLE and flush water lines thoroughly. Pull
DIVERTER and check SHOWER for proper operation.
Check SPOUT and SHOWER connections for leaks.
6
5
1
10
18
2
THREADS
ON CAP
APPLY
SEALANT
20
5
19
1/2" HEX
WRENCH
2
HOTTER
(Smaller Numbers)
0 1 3 5 7 9 11 13 15
5
1
1 0 9 4 9 7 A

Advertisement

loading

This manual is also suitable for:

Classic 853/496 seriesColonial 853/497 seriesVictorian 853/498 seriesVictorian 853/499 series