Follett Ice Pro DB650 Installation, Operation And Service Manual page 8

Automatic ice bagging and dispensing system
Table of Contents

Advertisement

2. Adjust bag pin width to match that of the bag wicket
(Fig. 5). Center bag pins evenly.
3. Remove rubber keepers from wicket and insert wicket wires
into bag pins. Transfer bags from wicket to bag pins. Slide 15
to 20 bags onto pins at a time until pins are full (Fig. 6).
4. Return chute lever to down position (Fig. 7). The
back of the chute holds bags to prevent more
than one opening at a time.
Fig. 5
Fig. 6
Fig. 7
8

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ice pro edb650

Table of Contents