PERCo ST-02 Series Assembly And Operation Manual

Speed gate and double-sided section
Hide thumbs Also See for ST-02 Series:
Table of Contents

Advertisement

Quick Links

Speed Gate
ST-02
and Double-Sided Section
STD-02
CERTIFICATE

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ST-02 Series and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for PERCo ST-02 Series

  • Page 1 Speed Gate ST-02 and Double-Sided Section STD-02 CERTIFICATE...
  • Page 2 ST-02 Speed gate and STD-02 Double-sided section Assembly and Operation Manual...
  • Page 3: Table Of Contents

    CONTENTS Application ..........................3 Operating conditions ......................3 Technical specifications ......................4 Delivery set ..........................6 Standard delivery set ....................... 6 4.1.1 ST-02 Speed gate ........................6 4.1.2 STD-02 Double-sided section ....................6 Optional equipment ......................7 Operation and description ...................... 7 Main features ........................
  • Page 4: Application

    It is possible to install access card reader inside of the speed gate sections that are produced by PERCo (IR03.1, MR07 OEM, RP-15.2) and third-party manufacturers. Access card readers are not included in the standard delivery set! Selection of the reader and its installation into equipment is performed by the customer (installer) in accordance with the checkpoint project and ACS and controller characteristics.
  • Page 5: Technical Specifications

    Assembly and Operation Manual 3 TECHNICAL SPECIFICATIONS Operating voltage ........................ 24 VDC Allowable voltage ......................20-28 VDC Maximum current consumption ..................max. 8.5 A Power consumption ....................max. 204 W Throughput rate in single passage mode ............. up to 60 persons / min Passageway width: ST-02.600 ........................
  • Page 6 ST-02 Speed gate and STD-02 Double-sided section Figure 1. Overall speed gate dimensions Figure 2. Overall dimensions of several passage lanes...
  • Page 7: Delivery Set

    Assembly and Operation Manual 4 DELIVERY SET 4.1 Standard delivery set 4.1.1 ST-02 Speed gate Main equipment: section ......................... 1 Master section ..........................1 Slave glass cover..........................4 filling glass ..........................2 sliding panel ..........................2 side panel ..........................4 central insert ..........................
  • Page 8: Optional Equipment

    ST-02 Speed gate and STD-02 Double-sided section 4.2 Optional equipment In addition to the standard delivery set, the following additional equipment can be supplied on a separate order: IR03.1 (HID/EMM), or MR07 OEM (Mifare), or RP-15.2 (HID/EMM, Wiegand) access card readers ..................2 per passage lane Mounting kit for the mounting surface for each speed gate section: PFG IH10 anchor (SORMAT, Finland) ..................
  • Page 9: Device

    Assembly and Operation Manual • There is a possibility of automatic emergency opening of the passageway when a Fire Alarm command is sent. The Fire Alarm command can be sent by the safety fire alarm device or by the operator by means of the emergency button (hereinafter – the emergency passage opening device).
  • Page 10 ST-02 Speed gate and STD-02 Double-sided section Figure 4. STD-02 overall view 1 – sliding panel; 2 – filling glass; 3 – glass cover; 4 – central insert; 5 – upper indication block; 6 – side panel; 7 – front panel; 8 – front end indication block; 9 –...
  • Page 11: Indication Blocks

    Assembly and Operation Manual 5.2.1 Section Each section is a single piece of equipment. There are two glass covers (3) that cover the top of the section. There is a central insert with grooves for the sliding panel (sliding panels) and for the filling glass located between the glass covers on top of the section.
  • Page 12: Rc-Panel

    ST-02 Speed gate and STD-02 Double-sided section The type of front end indication is selected during the speed gate installation by switching the connection cable of the front end indication block to the corresponding connector of the indication control module (located under the speed gate top cover inside the housing, Fig. 19). By default, the connection cable is connected to the ARROW connector, which corresponds to the white arrow.
  • Page 13: Remote Terminal Block (Din Rail)

    Assembly and Operation Manual Figure 6. Control board overview Connectors for jumpers: XP1 (Program) – service connector. • XP2 (Mode1) – connector for switching the speed gate in normally open mode (see section • 5.2.8 ). By default, the jumper is not installed, which corresponds to the normally closed mode. •...
  • Page 14 ST-02 Speed gate and STD-02 Double-sided section Figure 7. Overview of the remote terminal block Table 1. Contact assignments of the remote terminal block № Contact Master section Slave section +24V External power supply connection Not used +24V Power supply of the Slave section (DC cable Power supply of the Master section connection) (DC cable connection)
  • Page 15: Control Signals Parameters

    Assembly and Operation Manual The Slave section uses a similar remote terminal block to connect the power and motor drive control cables DC (9) and CAN (10), as well as, if necessary, the connection cable for the built-in reader. Also, there are unused and unnumbered contacts on the DIN-rail, in addition to those listed in the table, that can be used to connect other additional devices to the speed gate.
  • Page 16: Control Modes

    ST-02 Speed gate and STD-02 Double-sided section 5.2.7 Control modes There are two control modes – pulse and potential. In both modes the speed gate is controlled by sending commands (i.e. control signals combinations) to the control inputs: Unlock A, Stop and Unlock B and special Fire Alarm control input.
  • Page 17 Assembly and Operation Manual • sliding panels automatically open during authorized passage and automatically close after the passage; • when the power is turned off (power loss), the sliding panels remain in closed position and, if necessary, can be manually moved apart (not locked). 2.
  • Page 18: Automatic Opening In The Selected Direction" Mode

    ST-02 Speed gate and STD-02 Double-sided section The microcontroller will deactivate the alarm mode when the user leaves the passageway. The audible alarm switches off. In the normally open operating mode, the speed gate sliding panels will move apart and open the passageway. In the potential control mode, the speed gate operation algorithm depends on the external commands of the ACS controller.
  • Page 19: Rc-Panel Connection

    Assembly and Operation Manual 5.3.1 RC-panel connection RC-panel is connected with a flexible multicore cable to Unlock A, Stop, Unlock B, Led A, Led Stop, Led B, Sound and GND contacts of the remote terminal block in accordance with the speed gate wiring diagram (see Fig.
  • Page 20: Operation From The Acs

    ST-02 Speed gate and STD-02 Double-sided section When the Fire Alarm input is not used it is necessary to install a jumper wire between the Fire Alarm and GND contacts of the control board. By default, this jumper is installed. The speed gate switches to the Fire Alarm mode when the control signal is sent to the Fire Alarm input: if the speed gate sliding panels were closed, then they will open in all operating modes and...
  • Page 21: Siren

    Assembly and Operation Manual 5.4.2 Siren The siren is connected to the ALARM relay output of the control board via ALARM 1, ALARM 2, GND and + 12V contacts of the remote terminal block in accordance with the speed gate wiring diagram (Fig.
  • Page 22: Safety Requirements

    ST-02 Speed gate and STD-02 Double-sided section The speed gate in the standard delivery set is packed in shipping boxes that protect it from being damaged during transportation and storage. Parts and fasteners of each section are supplied in two boxes, fastened together. The total number of boxes (assemblies) depends on the ordered delivery set.
  • Page 23: Operation Safety Requirements

    Assembly and Operation Manual Operation safety requirements General safety rules must be observed prior to operating the speed gate. Do not! • Operate the speed gate in conditions that do not meet the requirements of the section 2. • Do not operate the speed gate at a voltage different from that is specified in the section 3.
  • Page 24: Cable Length

    Slave section (side of the double-sided section). Master or Slave side of the double-sided STD-02 section can be identified by means of stickers located under the side panels (6). The Video Guide section on the website www.perco.ru contains video guide on assembly and installation of ST-02.
  • Page 25 Assembly and Operation Manual Mark and drill holes for anchor sleeves on the mounting surface for fastening speed gate sections in accordance with the layouts, presented in Fig. 13-15 and in compliance with the checkpoint project. Use a carbide drill to drill holes. The drilling depth for the standard PFG IH10 anchors should be 65 mm.
  • Page 26 (see Fig. 20). Attention! By default, it is possible to install the PERCo access card reader and ACS controller inside of the speed gate section. Third-party hardware must meet the following requirements: overall dimensions of ACS controller, −...
  • Page 27 Assembly and Operation Manual As a matter of convenience, inputs and outputs of the built-in ACS controller may be connected not to the DIN rail contacts, as shown in the layout (Fig. 17), but directly to the corresponding contacts of the control board (X2 and X3 connectors, Fig. 6). Connection layout variant is shown in Fig.
  • Page 28: Mounting Surface Layout

    ST-02 Speed gate and STD-02 Double-sided section 8.5 Mounting surface layout Figure 13. Layout for installation of the sections with the passageway width of 600 mm (ST-02.600, STD-02.600)
  • Page 29 Assembly and Operation Manual Figure 14. Layout for installation of the sections with the passageway width of 900 mm (ST-02.900, STD-02.900) Figure 15. Layout for installation of the sections with different width of the passageway...
  • Page 30: Speed Gate Wiring Diagram

    ST-02 Speed gate and STD-02 Double-sided section 8.6 Speed gate wiring diagram Figure 16. ST-02 and STD-02 wiring diagrams for the organization of a checkpoint with several (N) passage lanes...
  • Page 31 Assembly and Operation Manual Figure 17. Speed gate wiring diagram...
  • Page 32 ST-02 Speed gate and STD-02 Double-sided section Table 4. Layout parts list of electrical connections QTY, Item Designation PCs. Master section (side of the section) A1.1 Remote terminal block (DIN rail) of the Master section A1.2 Control board Slave section (side of the section) A2.1 Remote terminal block (DIN rail) of the Slave section RC-panel...
  • Page 33: Installation And Dismantling Of The Speed Gate Parts And Elements

    Assembly and Operation Manual 8.7 Installation and dismantling of the speed gate parts and elements Attention! Parts of the speed gate housing are made of polished stainless steel and glass. Be careful, prevent them from falling to avoid damages, place them on a flat, stable surface with the outer part up, protect from scratches.
  • Page 34: Removing The Section From The Housing

    ST-02 Speed gate and STD-02 Double-sided section 8.7.2 Removing the section from the housing Follow these steps for removing a section from the housing: 1. Turn the four M8 screws all the way out with the SW4 Allen wrench (see Fig. 20). 2.
  • Page 35: Dismantling And Installation Of The Removable Part Of The Section Housing

    Assembly and Operation Manual 8.7.3 Dismantling and installation of the removable part of the section housing It may be necessary to remove one of two (or both) removable parts of the housing in order to route the connection cables inside the speed gate housing (e.g. to the built-in controller or reader) (see Fig.
  • Page 36: Installation And Dismantling Of The Central Insert

    ST-02 Speed gate and STD-02 Double-sided section 8.7.4 Installation and dismantling of the central insert Follow these steps in order to mount the central insert: 1. Take the central insert from the delivery set, mount it into place, while observing the location of its grooves in accordance with the location of the sliding panels.
  • Page 37: Installation And Dismantling Of The Filling Glass

    Assembly and Operation Manual 8.7.5 Installation and dismantling of the filling glass Attention! In order to avoid injuries, ensure to disconnect the speed gate from the main and backup power before work! Follow these steps to install the filling glass: 1.
  • Page 38: Installation And Dismantling Of The Sliding Panel

    ST-02 Speed gate and STD-02 Double-sided section 8.7.6 Installation and dismantling of the sliding panel Attention! Be careful! When you turn on the power of the speed gate, the sliding panels motor drive is automatically activated, but in order to avoid injuries, make sure that there are no tools, fingers, clothing items, as well as other foreign objects left in before you turn the mechanism on! Follow these steps to install the sliding panel (2) on the speed gate section:...
  • Page 39: Installation And Dismantling Of Side Panels

    Assembly and Operation Manual 8.7.7 Installation and dismantling of side panels There are two types of side panels – external (mounted on the sections on the outside of the speed gate) and inner (mounted on the sections from the side of the passageway). Inner side panels, unlike the external, have cut-outs for the sliding panels.
  • Page 40: Installation And Dismantling Of Glass Covers

    ST-02 Speed gate and STD-02 Double-sided section 8.7.8 Installation and dismantling of glass covers The top of the section housing is covered with two glass top covers (4). Follow these steps in order to install each cover: 1. Unscrew the two M6×16 set screws all the way out by using SW3 Allen wrench through the holes on top of the section front end (see Fig.
  • Page 41: The Reduction Of The Passageway Width Of Std-02.900 Section

    (see Fig. 27). Moreover, consumer can use the services of special companies providing professional glass polishing or purchase new covers for replacement from PERCo. Figure 27. Gluing rubber cover on glass top cover 8.7.9 The reduction of the passageway width of STD-02.900 section Design of the STD-02.900 Double-sided section allows you to reduce the distance of departure of...
  • Page 42 ST-02 Speed gate and STD-02 Double-sided section Figure 28. Installation of the reflector Figure 29. Installation of the sliding panels departure limiters...
  • Page 43: Operation

    Assembly and Operation Manual Figure 30. Motor drive board 9 OPERATION Speed gate installation should be performed with the observance of safety rules described in Sect. 7.2. Forbidden! To move objects through that are larger than a width of the opened passageway. •...
  • Page 44: Potential Control Mode

    ST-02 Speed gate and STD-02 Double-sided section If the passage has not been completed or if another command has not been sent after the • "Single passage in the selected direction" command, then the speed gate will automatically switch to the "Passage denial" state after the Holding time in the unlocked state (by default set to 8 seconds).
  • Page 45: Actions In Case Of Emergency

    Assembly and Operation Manual Table 6. Potential control mode (Pulse switch is in OFF position) Indication Speed gate status It is necessary to Normally Commands Indication Normally open ensure RC-panel closed blocks mode mode The sliding A high level at panels are Unlock A and The red...
  • Page 46: Maintenance

    ST-02 Speed gate and STD-02 Double-sided section 10 MAINTENANCE Maintenance of the speed gate is carried out only by the manufacturer or PERCo service centers. It is recommended to use liquid non-abrasive cleaners that contain ammonia for cleaning the speed gate sections and sliding panels from dirt.
  • Page 47: Appendix 1. Operation Algorithm In Pulse Control Mode

    Assembly and Operation Manual Appendix 1. Operation algorithm in pulse control mode "Passage denial" (closed for entry and exit) active front at the Stop contact while there is a high level at the Unlock A and Unlock B contacts. Both directions close upon receiving this command. "Single passage in direction A"...
  • Page 48 PERCo Polytechnicheskaya str., 4, block 2 194021, Saint Petersburg Russia Tel: +7 812 247 04 64 E-mail: export@perco.com support@perco.com www.perco.com...
  • Page 49 www.perco.com...

This manual is also suitable for:

Std-02St-02.600St-02.900