Download Print this page

Vision Metron Front Hydration System Installation Instructions page 2

Advertisement

Aero Bottle Installation:
1.
Slide Aero bottle ③ in to mount from the front (Fig. 4).
2.
Wrap hook-and-loop strap around the front of the bottle and through the strap channel (Fig. 5).
3.
Fold strap back on itself and press firmly to secure.
Fig. 4
Aero Bottle Cap Removal and Installation:
1.
Remove the 2 Port Screws ⑭ (Fig. 6).
2.
Select the correct Filler Port Cap ⑩ ~ ⑫ for your application (Fig. 7).
3.
Install cap and screws. Tighten screws.
ero Bottle Cleaning:
1. Open Antisplash Lid ⑬ and remove Filler Port Labrynth Spout
2. Pull out Flex Straw
and use a bottle brush (Fig.
3. Rinse with warm water and air dry before reassembly.
Fig. 5
and Filler Port Labrynth Spout Mazes
9) and warm soapy water to clean bottle, spout and straw.
Fig. 6
⑧ ⑨ (Fig. 8).
,
Fig. 8
Fig. 7
Fig. 9

Advertisement

loading

This manual is also suitable for:

V0132