Download Print this page

Curtis Nitrogen Infusion Box User Manual page 9

Advertisement

INSTALLATION INSTRUCTIONS
Prepare for Operation
9
Open the main gas shut-off valve and adjust the
2
regulator on the N
The pressure required for your system may vary,
10
2
keg and NIB N
supply valves on the manifold, if
11 Clear air from the line(s) by opening the faucet(s)
12 Sanitize the dispensing system according to the
instructions in the CLEANING INSTRUCTIONS
13
(set between 36°F/2°C and 40°F/4°C) and allow
14 Connect the chilled beverage product keg(s) to the
15 Remove the covers over the level adjustment
Make sure that each knob's red collar is
16 If the dispensed beverage does not have enough
foam, turn the knob(s) slightly counter-clockwise
"blowing foam", turn the knob(s) sightly clockwise
the way down when locking (see diagram)!
NOTICE: To avoid damage to the adjustment
NOTE:
a short delay before infusion adjustments take
NOTE:
recommends that the N
supply to between 30 - 50
2
supply line (IN) and
Do not push the red collar all
2
gas supply be turned
Main gas
ON
2
N
tank
Manifold
ON
ON
2
Keg 1 N
NIB N
Red
collar
Unlock
Lock
Wrong
Adjustment Knob
Side View
II43
Gas
pressure
gas in tank
Pressure
2
N
IN
ON
2
2
Keg 2 N
NIB infusion
knobs
090919F

Advertisement

loading

This manual is also suitable for:

Nib seriesNib1Nib2Nib3