Transformer Settings; Transformer Setting - Whale BP1558B Booklet

Automatic pumped shower, drainage systems
Table of Contents

Advertisement

Transformer Settings

Note: For optimum performance the transformer
settings will normally require adjustment.
8.1 To make adjustments move the jumpers on the
base of the transformer to connect pairs of
contacts to suit the particular installation as
follows:-
Setting 1
Start Delay (1 or 2) This adjusts the delay
between the pump being switched on and the
pump starting so that the gully is full of water
before the pump starts.
Short Delay (Default Setting) for small
1
shower trays.
Long Delay is designed for wet floor and
2
standard shower installations.
Setting 2
Mixer Electric (M/E) Select your type of
installation.
M (Default Setting) for Mixer Valve
Electric shower setting.
E
Setting 3
Off Delay (10, 30, 90, 180 seconds) Adjust
the time that the pump will over-run to clear
the shower tray/area to suit the installation.
1.14
10 Seconds: Suitable for most electric shower
30 Seconds: (Default Setting) Designed for
90 & 180 Seconds:
Setting 4
M & R - unused
8.2 Purge Cycle After 15 minutes the transformer
will reactivate the pump for approx 10 seconds
to remove any run-off or condensation that has
collected in the gully to leave the shower
area dry.
Factory default settings
installations.
wet floor areas.
These settings are suitable for larger wet
floor areas.
11

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bp1578

Table of Contents