Room & Board Fort Bunk Bed Assembly Instructions

Advertisement

The Fort Bunk Bed Assembly Instructions

List of Parts:

1 – Headboard
1 - Footboard
1 - Full Size Frame
1 – Twin Size Frame
1- Full guard rail with 2 screw/nut assemblies attached
1- 3/4 guard rail with 2 screw/nut assemblies attached
1- Ladder with 2 screw/nut assemblies attached

Hardware:

6 screw/nut assemblies attached to appropriate component
Each screw/nut assembly includes:
1 Nut – 3/8" Sq. 3" long
2 Screws 10-24 x 1/2"
#10 x 3/4" Self-drilling screws

Tools required:

Phillips screwdriver

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Fort Bunk Bed and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Room & Board Fort Bunk Bed

  • Page 1 The Fort Bunk Bed Assembly Instructions List of Parts: 1 – Headboard 1 - Footboard 1 - Full Size Frame 1 – Twin Size Frame 1- Full guard rail with 2 screw/nut assemblies attached 1- 3/4 guard rail with 2 screw/nut assemblies attached...
  • Page 2 People required: 2 People are required for assembly. You need a person on each side of the bed during assembly. The 2 people will be required to lift 100 lbs to a height of 55” and hold long enough to slide the rails of the twin rail/slat combination piece over the pockets on the bed ends.
  • Page 3 end, put the long square nut in between the holes of both C brackets, insert the screws through the C bracket holes (top and bottom) and screw them into the long square nut. Tighten screws with screwdriver. 8. On the same side as the ladder, the 3/4 guard rail should be attached to the end of the bunk without the ladder.

Table of Contents