Page 1
Model HE-NAS 10ft Wide Size Range A (mm) B (mm) C (mm) 10’5” x 6’8” 2036 10’5” x 8’8” 2656 3212 1670 3276 10’5” x 10’9” 3896 10’5” x 12’9”...
Page 2
Guarantee Your new Hercules greenhouse is guaranteed for 10 years against faulty manufacture of the framework. This does not include glass, moving parts, accidental damage or wind damage. View Orientation...
Page 3
Slab Base Size (Recommended) Base Preperation Note: The base should always be larger than your building. The measurements given should only be used as a guide. Building A (mm) B (mm) Size 2600 10’5” x 6’8” 10’5” x 8’8” 3200 3700 10’5”...
Page 4
Part Size 10 10 10 10 Size 10 10 10 10 Part Section Profile Section Profile (mm) 6 10 12 (mm) 6 10 12 300 Base bracket Base Bracket Bracing, flat 1,779 Front Purling Rear Purling 3,116 Flat Bracing 1,779 Front Cill 3,128 Rear Cill...
Page 5
Part Size 10 10 10 10 Part Size 10 10 10 10 Section Profile Section Profile (mm) 6 (mm) 6 10 12 10 12 445 Roof Glazing 1,872 Door Bottom Door Top Ridge 3,748 3,128 2,508 Door Middle 1,888 1 Ridge Cantilever 3 717 Door Stile with...
Page 7
IMPORTANT Make sure you insert all the bolts needed into the glazing bars. Aslo remeber to insert the glazing rubber. These can not be fitted later.
Page 12
Part Size Quantity Number (mm) Side Assembly 1742 1888 1670 1888 576 (M6) 579 (M6) extra 588 (M6) bolts 576 2 576 2 for your 588 1 588 1 louvre Part Size Quantity Number (mm) 1742 2508 1670 2508 Partition 576 (M6) If you have a partition consider its location at this...
Roof Assembly Extension/Partition If your greenhouse has an extension or partition refere to the relevent instruction book now. IMPORTANT Do not fix the greenhouse to the base untill the greenhouse is fully glazed.
Page 16
576 6 Vent Location You need to decide at this point where you want you’re roof vent. Insert an extra bolt (576) into the glazing bar (445) either side of the vents location. IMPORTANT Do not fix the greenhouse to the base untill the greenhouse is fully glazed.
Page 19
Slam Bar (542) Attach the slam bar to the extra bolts you inserted (page 14). Leave these finger tight as you will need to adjust the height of the slam bar when in- stalling the glass. The slam bar should slot over the top edge of pane ‘U’.
Page 20
IMPORTANT Do not fix the greenhouse to the base untill the greenhouse is fully glazed. When istalling the under vent pane (U) trim the capping to allow the vent to close. Don’t fit the pane above the door (QQ) untill you have installed the doors. This will help with adjustment for a smooth running door.
Page 21
External View W-Clip For Peak models with kick panels: C becomes 610x1500 B becomes the aluminium kick panel. No plastic glazing separator is needed between the two. Louvre make up pane V changes to two panes: (one above and one be- low louvre: 610x 153 below and a 610x893 above.) 1020...
Page 22
Glass Stops Hercules glass stops require no drilling, simply line up the bend in the plate with the bottom off the roof sheet and HE555 fix using the self-start screws. A cordless screwdriver will be need to insert the screws.
Page 23
Louvre Assembly There are two ways of Internal View installing capping around louvre. Option 1: Cut the capping above and below the louvre. Option 2: Insert a full length of bar capping. You have to push the bottom edge in first between the louvre and the glazing bar.
Page 26
XL Autovent Attachment to Hercules Greenhouses Internal View...
Page 27
Rotate to adjust the position of your vent. You should take the weight of the vent in one hand while doing this. CLAMP Section View GLASS CLAMP Section View...
Door Assembly Start by fixing the door middle in place (373). Make sure this is the correct way up (the channel should face down). Slide the edgign strips into place (558), then slide the glass into the edging strips. Then slot the top and bottom into place. Troubleshooting If the top and bottom don’t line up with the pre drilled holes in the door stiles:...
Page 30
Door Instillation First you must insert the door fluff (371) into the door stiles (379). To locate the door wheels and the door guide you will probably have to adjust the height of the door track (402), you do this by loosening the bolts that join the door track support bracket to the glazing bars.
Page 32
Fix the greenhouse to the floor using 2 inch screws and rawl plugs. Ensure the greenhouse is level and the uprights are vertical before fixing. IMPORTANT Do not fix the greenhouse to the base untill the greenhouse is fully glazed. Internal View...
Page 33
Downpipe Instillation Firstly you need to decide whether you want the water in your gutters to drain to the front or the rear of the greenhouse. The gutter outlet and stop end simply push into the gutter. For an even better seal you could run a bead of silicone around the inside edge of the gutter before inserting the outlet and stop end.
Page 34
Choose one of the options for attaching Downpipe Attachment your downpipes. It is entirely your preference, either method is as good as the other. Option 1 Option 2...
Page 35
Optional Cresting and Finials It is easier to install the cresting and finials before you glaze the building. Howerever it is possible to slide the section on from one end connectinhg them as you go. We recomend you secure these in place with clear silicone.
Page 36
The Greenhouse People Unit 19, Blythe Park Cresswell Stoke-on-Trent Staffordshire ST11 9RD 01782 388811 info@greenhousepeople.co.uk...
Need help?
Do you have a question about the HE-NAS Series and is the answer not in the manual?
Questions and answers