Download Print this page

Sealey bg200/99.V3 Instructions page 4

Bench grinder ø200mm 600w/230v heavy-duty

Advertisement

5.2.4.
Hold grinding stone firmly. to protect your hands use cloth or wear gloves. unscrew retaining nut (fig.7.1)
Note:
grinder
has
the left side nut has a left hand thread and must be loosened by turning clockwise. it may be necessary
to strike the wrench sharply in the loosening direction with the heel of your hand to loosen the nut.
5.2.5.
Remove grinding stone
blotter
(5),
5.2.6.
carefully inspect the new stone before installing to ensure there are no fissures, chips, or cracks.
Warning! dO nOt uSe a damaged StOne.
5.2.7.
inspect the blotters, if they are damaged replace them. the grinder must never be used without stone
blotters, should you not have any available when you need to replace them, cut out a piece of suitable
cardboard the same shape for temporary use only.
5.2.8.
Install
the
new
&
6)
are
side against the blotter).
5.2.9.
Hold stone steady and secure locking nut. dO nOt over tighten as this may crack the stone. 5.2.10.
replace stone
cover,
re-adjust tool
6. OperatiOn
change a wire wheel. Assembly is the same as with a stone.
6.1.
pre use inspection.
note: use the same clearance and alignment information if your model has a wire brush.
Warning! INSPECT THE
GRINDER
is unPluGGed from THE
6.1.1.
check the tool rests are securely fixed and set at a maximum of 2mm from the grinding stone.
6.1.2.
check that eye shields are in good condition, are secure and that you can see through them clearly.
6.1.3.
turn the grinding stones by hand and check for any damage. check they do not touch the tool rests and are correctly aligned.
if any of the above checks fail, replace, repair, or adjust as necessary before starting the grinder.
6.2.
Stone use.
depending on the model, grinders are supplied with one or two aluminous oxide stones. stones have two grades, fine are preferred
for hard materials and a coarse stones for soft materials.
When
grinding, should
the
material being
important reminder: Grinding stones muSt only be assembled by a person holding a grinding wheel certificate.
6.3.
using the grinder.
Warning! Before
commencing
section
1.
Safety
safety location.
switch the grinder on, and bring the work piece slowly into contact with the spinning stone, or wire wheel.
unplug
clean
7. maintainance
Warning! ensure the grinder is unplugged from the mains power supply before performing any maintenance or service.
7.1.
As the grinding stone wears, adjust the position of the tool rests. the rest must be at a maximum of 2mm from the stone surface.
7.2.
regularly remove the grinding stone covers and clean out any dust and dirt.
7.3.
the machine motor and bearing are sealed units and require no regular maintenance. should you require assistance, contact your
local sealey service agent.
7.4.
for information relating to the handling and maintenance of grinding stones refer to section 5.
parts support is available for this product. to obtain a parts listing and/or diagram,
please log on to www.sealey.co.uk, email sales@sealey.co.uk or telephone 01284 757500.
environmental protection
recycle unwanted materials instead of disposing of them as waste. All tools, accessories and packaging should be
sorted, taken to a recycling centre and disposed of in a manner which is compatible with the environment. When
the
off
and the fluids according to local regulations.
Weee regulations
dispose of this product at the end of its working life in compliance with the eu directive on
© Jack sealey limited
The
nut
on
the
standard right
hand
thread
washer
(fig
7.2),
blotter
washer
(6)
from
main
stone
by
reversing steps
installed with
the
flange
rest
to
a
from
stone
securely. note: You do not require a certificate to
GRINDER
BEFORE OPERATING
MAINS
POWER BEFORE COMMENCING
surface
of
the
stone
ground)
it
is
probably the
work,
ensure
you
Instructions
Plug grinder into the mains power supply. Place the eye shield in its appropriate
product
becomes completely
any
fluids
(if
applicable) into approved containers and dispose of the product
Original Language Version
right
side
of
(undo
anti-clockwise).
(3),stone (4),
2nd
spindle (7).
above.
Ensure
washers (2
on the outside, (i.e. the concave
maximum of
2mm
face
and
tighten
THE
MACHINE.
become "loaded" (coated
wrong grade of stone for the job.
have
read,
understood,
When you
have
completed
the
grinder
from
the
the
machine ready
for
unserviceable
and
the
ENSURE THE
THE
INSPECTION.
with
particles of
section 5.
and
apply
the
your
task,
mains
power
supply,
and
next
use.
requires disposal, drain

Advertisement

loading