Commissioning
1.
Before commissioning
Before putting into operation of the device following items have to be checked:
-
Shipping damages?
-
Indications on the rating plate have to match with the local public supply system.
-
All electrical protective measures have been carried out and serviceability has been checked.
-
All screwed connections are tight.
2.
At commissioning
During the putting into operation has to be checked:
Defect devices are not allowed to put into operation.
!
Protect the cable from oil and grease !
Handling
Connect device by means of safety plug to power supply system.
220 - 230 V depending on typ 0,75 kW - 1,26 kW
Turn thermostat handle to the right, up to the maximim power.
Heating up period comes to approx. 30 -45 minutes, it depends on the different dishes.
After heating up period the needed temperature can be adjusted, the regulation works automaticly.
After use switch off by bringing the main switch into the lowest position. Control light goes out.