GE GeoSpring GT50C10BAM Owner's Manual And Installation Instructions page 32

Table of Contents

Advertisement

Installation Instructions
HIGH LOAD ROOF INSTALLATION
3. Assemble Mounting Rails
installation. Cut off and discard the excess rail.
Remove and
Discard
4. Install Mounting Rails
brackets using T-Head Bolts. Place a
T-Head Bolt into the upper side of the rail to
secure in groove of the rail.
Place a T-Head Bolt into the lower side
groove of the rail.
up and down the rail so they accommodate
the mounting bracket.
the mounting bracket that is installed on the
32
1
90°
2
You can slide the bolts
the top lower portion of the rail and one on the
right side of the upper portion of the rail. Position
the rail and tighten the screw
0.78 in
Rails
0.78 in
Rails
Rail
T-Head
2
Bolt
Mounting
Bracket
Rail
Self-Tapping
Screw
Screw
Rail
T-Head
Rail
Bolt
Mounting
Bracket
1
49-6000121 Rev. 0

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Geospring gt40c10bamGeospring gt25c10bam

Table of Contents