Page 2
INCOMING FIBER PREPARATION (OUTSIDE PLANT CABLE) 46" LOOSE TUBE CABLE MOUNTING CLIP MAIN TRUNK FURCATION TUBING 250 µm TAPE 2.5" 30" 14" Cut supplied furcation tubing to 30" before starting the cable preparation process. Measure and ring cut 46" from the end of the main cable trunk. Remove cable jacket. Measure and mark the buffer tubes 2.5"...
Page 3
INCOMING FIBER PREPARATION (eABF AIR-BLOWN FIBER) ® CABLE MOUNTING CLIP 250 µm MAIN TRUNK 14" Measure and mark the eABF 14” from the end of the main cable trunk Using wire stripping pliers score and remove the 14” eABF outer jacket segment Cut the aramid yarn back to the cable sheath cut.
Page 4
Figure 16 To install the cassette into an ASCEND housing, follow the procedure outlined in the ASCEND Cassette Installation Instructions. Note: A separate cable mounting bracket kit should be used to secure the cable to the side of the housing.
Need help?
Do you have a question about the ASCEND and is the answer not in the manual?
Questions and answers