Vyaire MicroLab Operating Manual page 91

Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 11
Guidance and Manufacturer's Declaration – Electromagnetic
Immunity
The Micro Lab is intended for use in the electromagnetic environment
specified below. The customer or the user of the Micro Lab should assure
that it is used in such an environment.
Immunity Test
Electrostatic
discharge (ESD)
IEC 61000-4-2
Electrical fast
transient/burst
IEC 61000-4-4
Surge
IEC 61000-4-5
Voltage
dips, short
interruptions
and voltage
variations on
power supply
input lines
IEC 61000-4-11
IEC 60601 test
level
Contact: ± 8 kV
Air:
±2 kV, ± 4 kV, ±
8 kV, ± 15 kV
± 2 kV
100 kHz
repetition
frequency for
power supply
lines
± 0,5 kV, ± 1 kV,
± 2 kV
0 % U
; 0,5
T
cycle
At 0°, 45°, 90°,
135°, 180°,
225°, 270° and
315°
0 % U
; 1 cycle
T
and
70 % U
; 25/30
T
cycles
Single phase:
at 0°
and
0 % U
; 250/300
T
cycle
91
Compliance
Level
Contact: ± 8 kV
Air:
±2 kV, ± 4 kV, ±
8 kV, ± 15 kV
± 2 kV
100 kHz
repetition
frequency for
power supply
lines
± 0,5 kV, ± 1 kV,
± 2 kV
0 % U
; 0,5 cycle
T
At 0°, 45°, 90°,
135°, 180°,
225°, 270° and
315°
0 % U
; 1 cycle
T
and
70 % U
; 25/30
T
cycles
Single phase:
at 0°
and
0 % U
; 250/300
T
cycle
Electromagnetic
Environment
-Guidance
Floors should be
wood, concrete
or ceramic tile. If
floors are covered
with synthetic
material, the
relative humidity
should be at least
30%.
Mains power
quality should be
that of a typical
commercial
or hospital
environment.
Mains power
quality should be
that of a typical
commercial
or hospital
environment.
Mains power
quality should be
that of a typical
commercial
or hospital
environment.
If the user of
the Micro Lab
requires continued
operation during
power main
interruptions, it
is recommended
that the Micro Lab
be powered from
an uninterruptible
power supply or a
battery.

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MicroLab and is the answer not in the manual?

Questions and answers

Bernadette Hennen
April 3, 2025

Can I change the **** on a test if test already done? I am unsure which set up I should be using, eg I am using GLI quanger (2012) is this correct and how do I change back???

1 comments:
Mr. Anderson
April 3, 2025

No, the context does not mention the ability to change the setup on a Vyaire MicroLab test after it has been completed. It only describes setup options before or during testing.

This answer is automatically generated

Subscribe to Our Youtube Channel

Table of Contents

Save PDF