Download Print this page

Section 2: Survey; Section 3: Installation - Fireco Dorgard Pro Handbook

Hide thumbs Also See for Dorgard Pro:

Advertisement

Surveying a
building prior to
installation
2. Press down the plunger on your Demo
Dorgard Pro. This will sync the two units and
enable you to survey a building.
!
1. Switch your Dorgard Pro Demo & Site Survey
Transmitter into survey mode by flicking the switch
on the base of the Survey Transmitter to the right.
Dorgard Pro
!
3. Place the Survey Transmitter where you are
proposing to install the Fireco Transmitter. This should
be within 2 metres of the fire alarm relay if you are
planning on directly connecting the Transmitter.
If proposing an acoustically activated Transmitter,
place the Survey Transmitter where it is able to hear
the sound of the fire alarm above the background
noise. Do not site Transmitters within 1 metre of power
sources or metal surfaces (including Georgian
wire glass).
Survey
https://goo.gl/CMxYW8
Dorgard Pro
!
Page 5

Hide quick links:

Advertisement

loading

Related Products for Fireco Dorgard Pro