Installing The Adjustable Guide Rails For An Sud - Huawei OceanStor N8500 T Series Installation Manual

Clustered nas storage system
Table of Contents

Advertisement

OceanStor N8500 Clustered NAS Storage System
Installation Guide (for T Series V100R005)
Figure 7-7 Securing the SUC into the cabinet
Step 6 Check the SUC to ensure that it is properly installed and secured.
Step 7 If multiple SUCs are required, repeat
----End

7.7 Installing the Adjustable Guide Rails for an SUD

Before assembling SUDs, you must install adjustable guide rails to bear SUDs. With the
adjustable guide rails, SUDs can be placed into different depths of cabinets.
Prerequisites
The following tools and materials have been ready:
l
l
l
l
l
Issue 02 (2015-09-22)
Phillips screwdriver (M3 to M6)
Marker pen
M6 screws
Square-hole positioning pin (matching square holes on channels)
Round-hole positioning pins (matching round holes on channels)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
7 N8500 Installation (with S5600T, S5800T or S6800T
Storage System as the Storage Unit)
Step 1
to
Step 6
for other SUCs.
177

Advertisement

Table of Contents
loading

This manual is also suitable for:

Oceanstor n8500 v200r002Oceanstor n8500 v100r005

Table of Contents