Download Print this page
Midea MUE-18HRFN1-QRDO Quick Installation Manual

Midea MUE-18HRFN1-QRDO Quick Installation Manual

R410a twin floor & ceiling series

Advertisement

Quick Links

MI GUIDE
R410a Twin Floor & Ceiling Series Installation
Twin Floor/Ceiling Quick Step Installation Guide
Step 1: Prior to unpacking equipment please inspect boxes for any transport damage to ensure products are in perfect condition.
S1 & S2
(Interconnecting Wiring)
Step 2: Ensure the equipment model numbers on the boxes correspond with your companies purchase order.
Step 3: Unpack the equipment and ensure all parts are accounted for i.e Indoors / Outdoor / Hard Wired & Infra-red Controllers.
Indoor
Step 4: Store the Infra-red service controller safely as this can be used to speed up commissioning and servicing process.
Step 5: Review the installation and maintenance manuals which are provided.
Step 6: Carry out the positioning and installation of indoor and outdoor units as per guidelines within the installation manual.
Step 7: Install refrigerant pipework (Purge with OFN while brazing), electrical wiring & drainage pipe work.
Step 8: Interconnecting control wiring between indoor and outdoor units is made by linking into terminals S1 & S2.
Step 10: Set master & Slave indoor via SW5.
Outdoor
Step 9: Connecting of the Hard-Wired controller is made by linking to CN40 on the Master indoor PC Board in first indoor
Step: 10: Set auto restart function by setting SW3 on indoor unit to on position.
Step 11: Pressure test pipework (Note do not carry out pressure test while connected to outdoor unit to prevent contamination of factory charge)
(1) Strength test in 5 Bar increments up to full test pressure. (2) Then leak test at lower pressure. Evacuate system to 2 torr or lower for appropriate
SW3
time.
(Auto Restart)
Step 12: If required please add additional refrigerant charge (see table on reverse).
Step 13: Carry out all the commissioning checks required to activate the warranty of the newly installed system.
Step 14: Perform the test operation in accordance with the installation manual to ensure all functions and parts are working correctly.
Step 15: Complete your warranty card document and e-mail this with dated photo of outdoor serial number to:
info@fgeuropeuk.co.uk
Note: Installation videos can also be found on the Midea UK YouTube channel.
j
Please contact your Midea support team if you have any issues during the installation and commissioning process.
Midea UK Tel: 0191 263 6367

Advertisement

loading

Summary of Contents for Midea MUE-18HRFN1-QRDO

  • Page 1 Step 15: Complete your warranty card document and e-mail this with dated photo of outdoor serial number to: info@fgeuropeuk.co.uk Note: Installation videos can also be found on the Midea UK YouTube channel. Please contact your Midea support team if you have any issues during the installation and commissioning process. Midea UK Tel: 0191 263 6367...
  • Page 2 Power: Single Phase 3 Phase Model: Outdoor Indoor Option for power via outdoor also available (mm) 1565 Please contact your Midea support team if you have any issues during the installation and commissioning process. Midea UK Tel: 0191 263 6367...

This manual is also suitable for:

Mod30u-36hfn1-qrdoMue-24hrfn1-qrdoMod30u-36hfn1-rrdoMoe30u-48hfn1-rrdoMue-30hrfn1-qrdoMue-30hrfn1-rrdo ... Show all