GRE SIMPLEO 120 AR2085 Installation And Maintenance Manual page 4

Salt electrolyzer
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
The electronic control box and the electrolysis cell must be installed exactly as shown in the
following installation diagram, respecting the points indicated below:
3.2. - INSTRUCTIONS
1 – The electronic control box
Install this in a location with easy access, close to the filter electrical boxl. Install the electronic
control box in a vertical position and at a distance from the pool so that it complies with the
regulations of the country of installation. Never cover it, and allow space for air to circulate
between the back of the box and the wall.
Any contact between the electronic control box and water could create a risk of
electrocution.
Install the electronic control box in a dry, well ventilated location, protected from rain and water
splashes or jets, and safe from UV radiation. Non-compliance with these instructions will lead
to increased oxidation of metallic parts, and could even cause complete failure of the unit.
Connect the electronic control box to the filter electrical box, having first disconnected the
supply by turning off the differential cutout. Check that the electronic control box turns off
when the filter pump stops.
2 – The electrolysis cell and the electrode
Install the electrolysis cell in a by-pass configuration on the outlet of any other treatment,
cleaning or heating equipment, as shown in the installation diagram above.
Glue the electrolysis cell to the PVC pipe, preferably in a vertical position. If necessary, use
Ø 63/50 mm adaptors if the pipe diameter is 50 mm. Make sure that there is room to remove the
electrode from the electrolysis cell.
Wait until all glued joints are completely dry before subjecting them to water pressure.
Apply a little silicon grease to the sealing ring that fits between the electrode and the electrolysis
cell, and put it into place.
Take care to insert the electrode with the correct orientation. The water flow must pass between
the plates of the electrode, as indicated in the drawing below.
4

Advertisement

Table of Contents
loading

Related Products for GRE SIMPLEO 120 AR2085

Table of Contents