10. Install the assembled valve back in it's place. When assembling the valve, tighten the screws
alternately to even tightness.
There should be about 2 mm clearance between the nut (6) and the top of the discharge valve, when there is
no pressure in the receiver or the network. Do not tighten the nut!

3.7 Testing the pressure relief valve

All adjustment and repair operations of the pressure relief valve must be performed by qualified
maintenance technicians. All local regulations must be observed.
The compressor must be stopped and secured from automatic restart before attempting this procedure.
The opening pressure of the pressure relief valve must be tested in a separate pressurized air line. The
pressure relief valve has been tested at the manufacturer's site before shipping out the compressor. If the
valve has been replaced, it needs to be tested for proper operation. This procedure can be performed only
by a qualified mechanican.
The operation of the valve can be tested by turning the cap (1) counter-clockwise 1 to 2 turns. Always
tighten up the pressure relief valve cap properly to avoid damage caused by vibration.
10
Replacing the oil separator cartridge
3. Maintenance instructions

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tempest e6

Table of Contents