Basic Installation Procedure
1. After preparing the tank for installation, use Teflon tape or another
sealing material on the cord connector threads.
2. Screw the cord connector into the bushing (see Figure 1).
Figure 1. Tank Port Bushing Preassembly
3. Add Teflon tape or another sealing material to the tank port bushing
threads, and slide the cord connector and bushing into the bottom of
the LevelMaster with the cord connector on top.
4. Slide the float(s) onto the bottom of the casing (see Figure 2).
•
One float – The float is labeled with a arrow. Ensure that the
arrow points toward the top of the LevelMaster.
•
Two floats – The float labeled 'OIL' is put on first with the arrow
pointing towards the top of the LevelMaster. The next float
labeled 'WATER' is put on next with its arrow also pointing
towards the top of the LevelMaster.
5. Slide a float clamp over the bottom of the LevelMaster casing, and
lock clamp in place with a screw driver or nut driver. Ensure the
clamp is just above the bottom plug.
6. Slide the float and tank port bushing to the bottom of the casing.
7. Once positioned, carefully feed the casing and float(s) through the
tank port opening until the unit reaches the bottom (see Figure 3).
8. Screw the tank port bushing into the tank opening and tighten.
9. Plumb the cable for the wiring into the ¾ inch hub on the side of the
electronics enclosure.
Figure 2. LevelMaster Assembly
1