MIOX RIO Zuni Installation, Operation And Maintenance Manual

MIOX RIO Zuni Installation, Operation And Maintenance Manual

Oxidant tank kit
Hide thumbs Also See for RIO Zuni:

Advertisement

Quick Links

RIO Zuni™ Oxidant Tank Kit
Installation, Operation, and Maintenance Manual
MIOX RIO Zuni™ Oxidant Tank Manual
P/N: 102-00115-C
Page 1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the RIO Zuni and is the answer not in the manual?

Questions and answers

Summary of Contents for MIOX RIO Zuni

  • Page 1 RIO Zuni™ Oxidant Tank Kit Installation, Operation, and Maintenance Manual MIOX RIO Zuni™ Oxidant Tank Manual P/N: 102-00115-C Page 1...
  • Page 2: Table Of Contents

    Installation Location Requirements ...................... 6 Connections .............................. 6 Plumbing Connections .......................... 6 Hydrogen Vents ............................ 6 Level Switch Assembly .......................... 7 Installing the Oxidant Tank ........................7 OPERATION AND MAINTENANCE ......................... 9 MIOX RIO Zuni™ Oxidant Tank Manual P/N: 102-00115-C Page 2...
  • Page 3: Introduction And Overview

    RIO Zuni OSG. The RIO Zuni Oxidant Tank Kit is a product option that can be ordered with the RIO Zuni OSG. If an oxidant tank was ordered from MIOX, the oxidant inlet, tank vent, overflow and oxidant outlet valve will come pre-installed.
  • Page 4: System Illustrations And Component Descriptions

    Failure to provide appropriate hydrogen venting may result in explosions in the oxidant Safety Advisory tank. Follow all instructions in the MIOX Hydrogen Safety White Paper to prevent any hydrogen safety issues. Safety Labels Safety labels are provided to warn anyone nearby of the possible dangers and necessary precautions.
  • Page 5 Tank Hydrogen Vent Drop Tube Assembly Oxidant Inlet Tank Overflow Port Level Switch Cable Assembly Oxidant Outlet Figure 2: Image of generic oxidant tank showing all necessary components installed in the tank MIOX RIO Zuni™ Oxidant Tank Manual P/N: 102-00115-C Page 5...
  • Page 6: Installation And Startup

    Details for installing a hydrogen vent into a specific location are in the Hydrogen Safety White Paper. Installation Location Requirements MIOX recommends placing the oxidant tank near an external wall for ease of hydrogen venting and no further than 10 ft (3m) away from the OSG. (see Hydrogen Safety White Paper for details) Connections There are three types of connections on an oxidant tank: plumbing, vents, and level switch connections.
  • Page 7: Level Switch Assembly

    3) Connect Oxidant Outlet of OSG Connect the oxidant outlet from the RIO Zuni OSG to the oxidant inlet of the oxidant tank using the 3/8” I.D. vinyl tubing supplied with the OSG’s standard parts kit. Secure the connections with the 5/8”...
  • Page 8 ‘Low’. 5) Connect Level Switches Connect the Level Switch Cable assembly to the RIO Zuni OSG by matching the connectors. 6) Install Hydrogen Venting Install the hydrogen vent strainer as described in the Hydrogen Safety White Paper.
  • Page 9: Operation And Maintenance

    OPERATION AND MAINTENANCE Once installed, the RIO Zuni Oxidant Tank should require no regular maintenance apart from periodic inspection for leaks or changes in the hydrogen venting. MIOX RIO Zuni™ Oxidant Tank Manual P/N: 102-00115-C Page 9...