Maintenance; Technical Data; Scope Of Delivery - Honeywell RV284 Installation Instructions Manual

Check valve
Table of Contents

Advertisement

Available languages

Available languages

1. Safety Guidelines
1. Follow the installation instructions.
2. Use the appliance
• according to its intended use
• in good condition
• with due regard to safety and risk of danger.
3. Note that the appliance is exclusively for use in the appli-
cations detailed in these installation instructions. Any
other use will not be considered to comply with require-
ments and would invalidate the warranty.
4. Please take note that any assembly, commissioning,
servicing and adjustment work may only be carried out by
authorized persons.
5. Immediately rectify any malfunctions which may influence
safety.
2. Description of function
Spring loaded check valves have a moving seal disc which is
lifted off the seat by a greater or lesser amount depending on
the flow rate through the valve. If the flow falls towards zero,
then the spring pushes the disc back onto the seat and seals
the waterway.
To ensure continuing correct function it is recommended that
check valves be regularly checked and maintained (as speci-
fied in EN 1717).
3. Application
Medium
Water

4. Technical data

Operating temperature
max. 65 °C
accord. DIN EN 13959
(short term operation up to 90°C)
Max. inlet pressure
25.0 bar
Opening pressure
0.05 bar
Connection size
With internal thread

5. Scope of delivery

The check valve comprises:
• Housing
• Check valve insert (DVGW-certified)
• Test plug with seal ring
6. Options
RV284-... A =
With internal thread
Connection size
Honeywell GmbH
GB
7. Assembly
7.1. Installations Guidelines
• Install in horizontal pipework with test and drain plug down-
wards
- This position is best for draining
• Install shutoff valves
- Shutoff valves provide optimal serviceability
• Ensure good access
- Simplifies maintenance and inspection
• Install right after water meter if applicable
- Protects against backflow from water systems
7.2. Assembly instructions
1. Thoroughly flush pipework
2. Close shutoff valve on inlet
3. Release pressure on outlet side (e.g. through water tap)
4. Close shutoff valve on outlet
5. Fit check valve for example between water meter and
pressure reducing valve, filter or filter combination
• Note flow direction
• Install without tension or bending stresses
6. Slowly open shut off valves on inlet and outlet

8. Maintenance

8.1. Inspection
8.1.1. Check valve
Interval: once a year
1. Close shutoff valve on inlet
2. Open test valve
• Until the pressure is released, some water will flow out
of the test valve. After a short period of time the water
flow should stop. If the water continues to drip or run,
then the check valve must be replaced - see servicing
of check valve
3. Close test valve again
4. Slowly open shutoff valve on inlet
/
" - 2"
1
2
4
MU1H-1204GE23 R0212

Advertisement

Table of Contents
loading

Table of Contents