Kruger HAP Manual page 6

Table of Contents

Advertisement

INSTALLATION PROCEDURE - MAIN BOOM
Install all the system components according to manufacturer installation drawings. If not available,
use the following as a basic guide for component location.
Strain Relief Anchor
Optional 6 Pin Receptcle
A-2-B Switch
offset 18°
USE
ACCEPTED
COMPONENT MOUNTING BRACKETS TO THE STRUCTURES.
Do not install cable reel into mounting bracket at this time.
1.
For an HLAP System install a piece of 10 conductor cable between the cable reel mounting
bracket and the 10 pin receptacle mounted at the boom pivot.
For an HAP System install a piece of 5 conductor cable between the cable reel mounting
bracket and the 6 pin receptacle mounted at the boom pivot.
Leave approximately 2 feet of excess cable at each end.
It is recommended, but not essential, that a piece of 1/2" conduit be mounted to the boom
Page 4
C
O M P O N E N T
5 Ft. Max. to First
Roller Guide
NOTE:
Locate cable reel on the
approximate centerline of
the boom.
Allow for clearance
between the cable reel
and any open cab
windows with boom in
the raised position.
C A U T I O N
WELD
PRACTICE
NOTE
MAIN BOOM WIRING
PAT America, Inc.
L
OCATION
1/2" Conduit
Control Panel
Cable Reel
with Drip Loop
WHEN
H(L)AP - AA 103 - Install (RE699)
Boom Pivot
Plug / Receptacle
WELDING

Advertisement

Table of Contents
loading

Related Products for Kruger HAP

This manual is also suitable for:

Hlap

Table of Contents